Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

E.11.PUR:5.5 - Shared resources and changes to support

Two candidate uses require the same exclusive instrument. Exclusion alone leaves their coordination conflict unresolved.

An applicable selected schedule S1 assigning A before B supplies the directional sharedConstraintResolution basis; an applicable S2 selecting B before A defeats that A-before-B claim.

An unknown priority rule leaves the direction unresolved. Adding both opposite edges would violate the strict-order cycle condition.

If a coordination description copied an old ECS expectation, replace the copy with the current exact expectation and required-content/supplier basis. Reassess the dependency only where that semantic content changed.

A new closure or witness can instead change readiness without changing the ordering relation.

A new rendering of S1 is descriptive; an actual change from S1 to S2 is constitutive and requires the changed order to be assessed. Candidate fit and unrelated dependencies remain usable.