E.11.PUR:5.1 - Applicable but not recommended

A team considering a high-cost pump test is asked whether its causal model gives it grounds to expect the proposed intervention to work. C.28 can supply that assessment. A separate decision concerns Friday’s use of the rig. A.21 can assess the test against an applicable gate profile. Permission to use the rig depends on the governing rule, who is authorized and when the permission is effective. The causal question can arise before anyone has established an actual C.22.PFR Problem.

For advice on the model, recommend C.28 and give its qualified result. For a decision about running the test, even a favourable model assessment and a passed gate are compatible with the operator’s permission taking effect on Thursday or only on Monday. Establish the assessment and permission required for the same test and whether each applies by Friday. A standing rule may already authorize the operator without a separate gate. If an authority must decide and can check the test arrangements while the model is being assessed, the inquiries can overlap. If the decision requires the assessment, allow time to act on it.

For a local, reversible recommendation with no later reliance, the team can explain the fit and its decision in the working conversation. A recommendation to obtain both results gives the team a way to proceed. The decision to run the test depends on the results it actually obtains.

If a later gate review needs to replay each aspect independently, that review may create current fit findings and a current applicability finding from the then-current basis.

Do not backdate the later findings. If the original readable rationale was retained, it remains the earlier recommendation’s historical basis.

E.11.PUR:5.1.1 - An earlier result still answers the concern

The team already has a C.28 causal-use result for the same pump model, intervention question, declared use, sources, assumptions and qualification window. The result still answers the model question. Cite it and finish that inquiry. For the Friday decision, use the assessment wherever the governing test conditions require it and settle any outstanding question about permission to use the rig.

If the team uses the result as a premise in a project discussion and the source-to-use account is still implicit, it uses A.10 to make the source → result → claim connection explicit for that bounded use.

If later gate Work relies on that result, retain its required evidence and authority grounds; use A.10 when the source-to-use account remains implicit or the gate’s replay needs require that account, naming the result and bounded use.

If new operating conditions change the causal-use assumptions or qualification window, the team reopens that affected C.28 question rather than treating the old result as current or restarting every coordinated pattern use.

E.11.PUR:5.1.2 - No new use is worth recommending

A team considers an optional check that fits its concern and conditions. The most it could save is ten minutes; performing it takes an hour. The present work already meets the needed result, and no obligation requires this check.

The team establishes applicability, compares the hour with the possible saving, and continues without selecting a new use. It needs neither a recommendation episteme with a fictitious candidate nor a refusal document.

If asked why, it states the cost comparison in the conversation.

If new information makes that check capable of preventing a consequential loss, the team reopens this comparison. If the check becomes obligatory, the earlier optional-advice conclusion does not discharge the obligation. A less burdensome check with a worthwhile expected result can support the ordinary positive recommendation instead.