E.10:0.2c.21 - decision, action, work, method, plan
Do not let action cover every project-side event. An action nominal such as testing, assembly, maintenance, evaluation, or inspection is a morphology cue, not a kind. Placement in function- or flow-structure prose identifies no U.Function: apply A.6.F when the function-like use remains claim-bearing and its FPF object or relation is hidden; otherwise name the already recovered method, method description, required-transformation or required-effect claim, actual U.Transformation, TransformationFlowStructure locus, functional-view record, plan content, exact Work occurrence, or other value under the pattern that defines it. A WBS element, activity, or Work Package remains plan- or assignment-episteme content about intended work; none of these uses identifies an actual Work occurrence admitted under U.Work.
Split decision-making and decision records under C.11; local system-role-kind classification under A.2; U.SystemRoleAssignment occurrences under A.2.1; Method under A.3; planned work and WorkPlan under A.15.2; dated Work occurrences under A.15.1; actual launch or performed values under obtaining direct relations or A.6.1 bindings; separate performed-work, finalization, result, telemetry, and gate records under the patterns that define them; action invitation under A.6.A; communicative acts under A.2.9; commitments under A.2.8; and strong grants under A.2.8.PER. A planned filling or a compatible type can leave the position open. To use a ticket or record as grounds for an actual participant relation, establish how it relates to the work or how the applicable rule makes an authorized entry effective.
A reusable name for a Work kind can be established under F.18 before the first performance. To name a particular Work occurrence, first establish it under A.13 and A.15.1 from its actual performer basis, time, Method and containing System. If the reusable account also needs precise assignment-bound attribution, establish F.6 afterward through the same obtaining assignment. Keep the affected referent, application bindings, resource use, and other direct facts separately recoverable. Add a continuity policy only when occurrence identity matters. Keep production, measurement, evaluation, delivery, acceptance, and downstream-effect claims under their direct patterns.
P2W in E.18.1 carries accepted problem-side content into a question needed by the receiving work, then preserves that content in the result or stop obtained using the pattern that answers the question. E.18:2 describes a first-principles specialization that can connect principles, theories and signatures with method choice, work planning, work execution, separate measurement or evaluation, and cycle return. The parts used depend on the receiving question; E.18.1:4.0b governs when an explicit transformation-flow structure is needed.