Jump to text
On this page
Copy and source
Original source · lines 92–100
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:05:20 UTC

RECOVERY — Restore a capability without restoring everything

  • Situation: Removing a harmful arrangement also removes a contribution on which useful work depended.
  • Question: How can the needed function be recovered and sustained through another tool, method or division of work?
  • First useful result or blocker: A feasible replacement contribution, its acquisition need and the conditions for its continued use.
  • Mantra: Identify the contribution the work still requires. Design a way to supply it under the new arrangement. For a claim of recovery, establish that the work obtained it under the conditions in question.
  • Start with: DTM.8 with FPF C.36.RP; DTM.2/.3 connect acquisition and transmission, and DTM.4/.6 test continuation under the changed arrangement.
  • Stop or return: A feasible design can complete an order for a replacement arrangement. To establish actual recovery, trace the contribution through the work that depended on it. Records of ordinary work can settle that question. Arrange a further trial when the existing evidence leaves a consequential uncertainty or the trial itself was commissioned.