DTM.8:4.4 - Check implementation across the method vertical
Start from the work to be protected and follow how the proposed action would preserve the result. Identify which operations are part of this order, what can be obtained from earlier work, and which other obligations need the same people or means. Use C.32.MWA where several contributions must operate together.
For example, “exclude an unreliable procedure” requires an available way to distinguish it under relevant conditions, authority to change admission, and an alternative means to continue needed work. A hypothetical perfect distinction is a model assumption, not an implemented capability.
Use the existing development and operational methods to obtain missing contributions. Restoring a capability can use a different tool, partner or division of work; C.36.RP helps avoid equating cultural recovery with a return to the old arrangement.