Customization and Productization Management Principles Framework Readme

Practical entries

Bring the question you need to answer. These three entries are examples. If none fits, search the Table of Contents or enter a pattern directly. An authorized configurator can select and apply a supported variant for a customer. An adviser can compare fit when the choice belongs to the customer. Ask for an explanation when you need to understand which provisions make the variant usable.

CUST-ENTRY-DELIVERY - Turn a successful delivery into an obtainable method

  • Situation: A service works when its author is present, but another prepared team cannot yet repeat it.
  • Question: Which work, preparation and help must become available for the next delivery?
  • First useful result or blocker: A constructed delivery method with an attainable receiving performance, or the capability, permission or support that is missing.
  • Start with: CUST.6.
  • Stop or return: Retain explicit assisted provision when it fits; return a false family assumption to CUST.3.

CUST-ENTRY-CHANGE - Improve the common offering while current customers continue

  • Situation: A shared change affects installed configurations, accepted meanings or support promises.
  • Question: How can the affected customers obtain a valid continuation?
  • First useful result or blocker: A compatible extension, transition, coexistence or retained arrangement with its work and authority, or the unresolved receiving result.
  • Start with: CUST.8.
  • Stop or return: Do not widen the change beyond its supported conditions. Preserve unaffected service and obtain the missing contribution.

CUST-ENTRY-GROWTH - Grow without hiding repeated invention

  • Situation: Several customers want related adaptations, and common development appears attractive.
  • Question: What can we share, how will it be delivered and what burden follows?
  • First useful result or blocker: A supportable answer connecting what can be shared, an obtainable delivery method and the full resource comparison, or the condition preventing it. A successful local case can remain local.
  • Start with: CUST.1, connecting the family in CUST.3, delivery in CUST.6 and resource comparison in CUST.7.
  • Stop or return: Use an adequate existing configuration directly. Narrow or stop the affected promise when capability, permission, resources or current obligations defeat it.

Use the whole Method or a sufficient part

Start with the supported offering and the actual customer result. Recover their consequential differences, then construct a compatible local and shared continuation. Productization can produce a repeatable service or reusable contribution; it does not require every local adaptation to become a common product.

The intended reader manages a product, service, customer delivery, implementation practice or another undertaking with continuing customer commitments. Use the full CUST.1 Method when the customer case and future offering must be developed together. Use a smaller Method when the problem is bounded. A supported configuration needs no new productization programme.

Read the Architectural Reference for the field, connections and limits. Using FPF Library explains how to obtain supplying frameworks. Perform the work with the required professional capabilities and permissions.