Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

CUST.8:4 - Solution

CUST.8:4.1 - Recover what is changing and who relies on it

Describe the proposed family change in terms of a useful result: a new supported variation, a replacement common operation, a changed provision form, a narrower support promise or retirement. Compare it with the present family, including local residues that still receive promised support.

Find actual consumers through the available agreements, configurations, delivery records, copied materials and observations of use. Include infrequent work and future obligations such as reproducing an earlier result. Absence from recent usage does not establish absence of reliance.

For each materially different use, recover what the recipient must still obtain, the inputs and meanings they depend on, the work they perform, the help they receive and the authority under which the arrangement can change. State what remains unknown about users whose reliance has not been observed. One plausible class of affected uses can reveal a problem while other consumers remain undiscovered.

CUST.8:4.2 - Separate the consequences before choosing the transition form

Compare old and proposed provision along the dimensions that change the customer’s result. These may include result meaning, permitted inputs, interface behavior, acceptance evidence, performer preparation, timing, access, payment or funding, and continuing support.

Obtain technical compatibility through SYSE.27 — Evolve Platform Interfaces and Contribution Paths when a platform interface or contribution path is involved. Receive the supported combinations, known losses and maintenance conditions. A preserved file format or successful request is insufficient if the recipient interprets the result differently.

Use MKT.11 — Align Promises, Partners and Execution when promises, partners and execution no longer align. Receive a feasible promise and actual provision arrangement. A unilateral provider preference does not supply the customer’s agreement or another party’s authority.

A rights or permitted-use change can defeat a technically feasible transition. Carry the intended recipients, materials and purposes into the applicable permission decision. Where customer-programme materials are involved, use the permitted-contribution treatment in MKT.14:4.3 within MKT.14 — Develop and Change a Programme for Selected Customer Organisations; where inquiry evidence is involved, use MKT.12:4.6 within MKT.12 — Investigate a Customer or Market Question for a Decision. Obtain other qualified professional contributions when the case requires them.

CUST.8:4.3 - Construct alternatives that preserve a complete receiving result

Change formConstruct the continuationBoundary to settle
Compatible extensionPreserve supported old use while making a new variation obtainable.Whether defaults, meanings, support and resource demand remain compatible.
Supported profile or coexistenceKeep distinct old and new conditions explicit and provide both for an attainable period.Who maintains each path and which combinations can operate together.
Adapter or conversionSupply a qualified translation or transformation with its acceptance and exception handling.Lost information, changed effects, partial failure and continuing maintenance.
Explicit migrationSupply the receiving provision and the work by which each selected use reaches it.Preparation, participation, authority, recovery and the point at which old provision can end.
Separate offeringGive materially different results their own supportable provision rather than force them into one family.Shared contributions can remain shared without promising interchangeability.
Retained arrangement or no changeContinue the supported local or common provision within its actual conditions.Its remaining burden and any later condition that makes continuation untenable.

Build the receiving path before scheduling its adoption. Name the new result, preparation, available means, actual performers and assistance. Work backward to the old dependencies that remain necessary until that result is obtainable. If a required conversion, explanation or support contribution is missing, construct or obtain it; a migration date does not fill that gap.

For an engineered platform migration or retirement, use the complete SYSE.29 — Decide Whether and How to Migrate or Retire a Supported Platform Path. It supplies affected-use recovery, transition alternatives, an executable increment, receiving-use and failure checks, and explicit retirement scope. Bring its qualified technical transition into the wider customer arrangement, then settle the family choice, promise alignment and resources.

CUST.8:4.4 - Make the selected transition feasible as part of continuing service

Choose the next increment by dependencies and available resources. Several customers may need to move together because they share state or an operating window; others can move independently. The smallest useful increment preserves a complete receiving result, not necessarily one customer or one component.

Use assignments and commitments already in force. Obtain any new agreement from those entitled to bind each contribution. Establish that performers have the access and time to deliver and that any required personal participation is available. Establish what changes in the customer’s work. Include the preparation, permitted transfers, acceptance, support and handling of local adaptations the move requires. Arrange practice with feedback when the changed work or the agreement calls for learning. Retain a qualified return path only where it restores the required result. Where effects are irreversible, use the supported forward repair, restoration with stated loss or authorized interruption; do not promise a generic rollback.

Compare ordinary service, transition, coexistence and later support together through CUST.7. A specialist cannot be counted as fully available for each at the same time. If the joint demand is infeasible, change the increment, obtain capacity, narrow the new promise or defer the change.

Explain the transition at the customer’s point of use: what changes, what they must do, what remains supported, when assistance is available and how to stop a failed move.

CUST.8:4.5 - Qualify the changed result and expand only within its conditions

Before extending a change to further customers, establish that the relevant uses and commitments remain supported. An existing qualified result or a general compatibility argument can settle this when it covers their conditions. Use a trial or rehearsal to resolve a material uncertainty, or carry out a trial explicitly ordered as part of the work. To report a completed migration, establish what moved and what service was available through the change.

Different questions need different evidence. A compatibility test can establish an exercised old/new behavior. A recipient’s completed task can establish that task under the trial conditions. Actual transition requires evidence that the selected uses moved. None of these alone authorizes ending an obligation.

When a trial fails, preserve unaffected service and return the specific defect: family assumption, unavailable preparation, inadequate conversion, missing permission, disputed promise or scarce support. An exception is not automatically a reason to abandon the common improvement; nor is a successful ordinary case enough to widen an unsupported variation.

CUST.8:4.6 - End only the reliance that has a justified disposition

For each remaining supported use, establish an actual continuation: qualified transfer, bounded continued support, an obtainable outside arrangement or an authorized end with its consequences understood. Keep unresolved use explicit rather than counting it as migrated.

Distinguish ending new sales, stopping new requests, removing a path, withdrawing support and disposing of retained material. Their permissions, times and consequences may differ. Update the family description and customer-facing instructions to match actual availability.

Return what changed to the receiving work. CUST.3 receives the supported family and exclusions; CUST.6 receives the revised delivery and support method; CUST.7 receives the observed transition and coexistence burden. If the change reveals a false general assumption about compatibility or transfer, also revise the relevant practice knowledge. A repaired customer configuration alone does not correct that assumption.