CUST.4:4 - Solution
CUST.4:4.1 - Translate the customer situation into consequential choices
Recover the intended result, operating environment, timing, recipient capability and constraints. Separate requirements from preferences. An inaccessible environment can rule out an offering; a preferred report layout may be an optional adaptation.
Use the family’s variation rules to identify live choices. Explain each in the customer’s terms: what changes in result, effort, delay, support or responsibility. Do not expose every internal parameter as a customer decision. A default is useful when its assumptions are visible and it does not conceal a consequential trade-off.
Check understanding where a term can change selection. “Managed” might mean software hosting to the provider and complete operating responsibility to the customer. Resolve that difference before comparing prices or configurations.
CUST.4:4.2 - Help the customer navigate the solution space
Eliminate combinations that violate a necessary condition. Compare the remaining alternatives by the differences that matter for the intended use. For a recommendation, present a manageable selection and its grounds. When customers retain the choice among all qualified configurations, give them a usable way to find and exercise any of those choices, including one outside the shortlist. A rule can express the full range.
A direct configurator suits choices whose consequences the recipient can understand and whose rules are sufficiently expressed. Assisted selection suits unfamiliar consequences, coupled options or incomplete information. A demonstrated example can expose meaning better than another field in a form. Obtain the customer’s missing input only when it can change the choice.
Use defaults and recommendations as explained assistance, not hidden commitments. When a choice transfers work to the recipient, show that work. For example, customer-hosted delivery may require local monitoring, updates and access arrangements that provider-hosted delivery supplies differently.
The result can be a selected combination, a recommendation or an account of the full range the customer can choose, with fit grounds and remaining conditions. If no combination fits, say what fails and return the substantive difference. An option the form will accept still needs qualified fit and provision. A recommendation can name one fitting member. If customers retain the right to choose later, identify what supply choices must remain possible until their decision arrives.
CUST.4:4.3 - Place common work and customer-dependent work
For each consequential activity, establish which customer information or commitment its performer must have before committing to it. In a sequential production route this can locate a customer order decoupling point. Independent branches can have different decision times. Determine where they must rejoin and what the customer is still free to choose at each point.
Compare at least the feasible early and late arrangements. Common preparation might include a base assembly, a tested module, a training method or a reserved service slot. Customer-dependent work might include final assembly, calibration, semantic mapping, local training or permission-dependent configuration.
| Arrangement | Potential benefit | Condition to test |
|---|---|---|
| Prepare a complete variant early | Short response after selection. | Demand and allowed variation justify inventory, reservation or maintenance of that variant. |
| Prepare a common base, finish after selection | Reuse of preparation with less premature differentiation. | Final work, inputs and qualified performers remain available within the promise. |
| Start most work after the order | Less speculative preparation and greater local adaptation. | Lead time, workload and cost remain acceptable. |
| Obtain a partner contribution at the needed point | Access to a capability or location not held internally. | The contribution, coordination and failure response are obtainable. |
Late calibration can become the bottleneck. Early software preparation can avoid customer delay but require maintaining many variants. Physical stock and software configuration have different cost and failure models; carry only the relevant dependence idea between them.
CUST.4:4.4 - Construct the complete chosen route
Follow the selected member from preparation to acceptance. Name the customer-dependent input, its supplier and required arrival time. Join it to the operation that consumes it. Resolve what happens if it is late, ambiguous or unusable. If the customer may still choose between members, follow each live choice back to the provider’s first irreversible commitment. At that moment the provider needs an action that works for all choices still indistinguishable to it, or timely information and authority to distinguish them. The same comparison applies to combinations of rights held by different customers.
Obtain an operating-capacity result through OPS.10 — Qualify Operating Capacity Under Variability when variability or a shared resource can defeat the timing. Check the relevant demand mix, waiting, variability, resource availability and supported operating conditions. An average utilization figure alone cannot settle the timing. Revise the differentiation point or promise if they do not fit. Under OPS.13, distinguish an appointment already agreed, a forecast of demand and an undertaking to meet every permitted call. Two branches that call equally often may alternate or call together. Their separate frequencies leave the coincidence of calls open.
Use CUST.6 where the route itself needs a repeatable delivery method. Use CUST.7 for the complete resource comparison. A configuration with a shorter quoted installation can be worse when qualification, customer preparation or support is included.
CUST.4:4.5 - Reopen the form of provision when it changes the answer
Sometimes the live alternatives are not variants of the same service. Buying an engineered result, receiving a maintained service and contracting for a bounded outcome distribute work and responsibility differently.
Use SYSE.8 — Develop an Integrated Offering and Provider Concept for Using an Engineered Result for its full integrated offering and provider-concept method when that engineered-result question applies. Supply the needed use result and candidate arrangement. Receive the contributing systems and parties, required customer participation, operating concept, observation and acceptance, responsibilities and risk conditions. Then test whether this concept fits the family, delivery capacity, resource comparison and existing commitments.
Observation alone is not influence over an outcome. A provider need not control every causal factor, but the promise must be compatible with its actual means, the other parties’ contributions, disturbances and the agreed consequences of failure. If the concept cannot support the proposed outcome, choose a narrower contribution, obtain further subject-specific evidence or decline that promise. Obtain the relevant professional method and evidence when the promised result extends beyond engineering.
CUST.4:4.6 - Make the selected configuration usable and revisable
When the customer has chosen, give the recipient and delivery participants the configuration, contributions, timing, support and acceptance conditions. When the choice stays open, give the customer the agreed alternatives or rule for selecting them, the decision time and a way to exercise the choice. Establish how the provider can act on each permitted choice in time. Preserve inexpensive reversibility where feasible and explain the consequences of changing a commitment before it is made.
Return a mismatch to CUST.3 when it challenges the promise for a member the family admits. One order within that promise can reveal the need to revise the rule or the provision. Repeated requests outside the stated family can remain local under CUST.2, or inform a proposal to extend it. Preserve the configuration actually selected for support and CUST.8 transitions.