Jump to text
On this page
Copy and source
Original source · lines 54–67
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

Enter from the control question

Your working difficultyObtain firstDirect entry
A useful observation arrives after the action deadline, or different channels reveal different partsAn observation and memory arrangement, its error bound and the actions it permits; or a precise information limitationCAD.5
One calculation cannot use the needed horizon, information and execution time togetherA justified division of decisions and its couplings, an assessment of the existing division, or grounds to retain one controllerCAD.1
Planner and feedback code use a “reference” with different timing or meaningThe actual exchange and its derived error dynamicsCAD.2
A stable controller cannot follow the requested command within state or actuator limitsA joint command and error domain for the required interval, including continuation or terminal conditions when required, or a demonstrated incompatibilityCAD.3
A more accurate model, faster planner or extra sensor competes for limited resourcesA comparison of complete feasible arrangements and the conditions of their realizationCAD.4

You can use CAD.5 without adding a planner or splitting control into layers. If the lower loop is qualified, you can retain it and change command admission. If a current, complete observation and a simple controller meet the task, you can keep them and stop there. Read the Architectural Reference when several results must fit together or a change reopens their conditions.

The intended reader can work with state-space models, feedback laws, bounded sets and elementary optimization. A reader who lacks those means needs instruction or a qualified control-engineering contributor. The examples are mathematical constructions. Before relying on a physical installation, establish its model, uncertainty and execution premises.