CAD.5:4.4 - Preserve the information needed by the next update
At each action time, use the following causal order:
- Propagate the previous representation using the executed input and the allowed disturbance.
- Incorporate each newly available packet at its sample time, then obtain the current-state projection.
- Use the projection for a current-state estimate. Choose an action from the full information available by the decision time, including any dependence between past observations and future disturbances. The projection alone suffices when it preserves the admissible actions and continuations needed for the duty. Apply the action by its deadline and retain the executed input for the next update.
Once no future packet can refer to a state older than D, project it out if the retained representation still preserves every constraint it places on future disturbances, observations and actions. This is different from throwing away the dependence between retained states. Duplicate packets do not supply additional independent information. In a bounded-set construction, independent noise need not be assumed: common error sources must be represented jointly or enclosed conservatively. With an uncertain timestamp, use the union of the admissible timestamp hypotheses, not their intersection.
If the compatible set becomes empty, the current model, bounds, packet, timestamp or executed-input record is inconsistent. A reset to an arbitrary point would discard the inconsistency. Use a separately qualified fallback, obtain a new trusted initialization, or declare the demanded continuation unsupported. Packet loss or delay outside the allowed family likewise invalidates the relevant bound until a qualified recovery applies.
Reduce the internal representation when its update and control use remain sufficient. One exact reduction is available when s=T_rx has closed dynamics T_rA=A_rT_r, the needed observations factor as C_j=C_{rj}T_r, and the control law and constrained quantities depend only on s. Then use s^+=A_rs+T_rB u^a+T_rw and the corresponding observation sets. If an omitted component influences a required future quantity, its influence must instead be retained or bounded.
Thus two histories may be merged only when the merged representation still supports every required future update and action under the allowed future observations and disturbances. Equal current estimates are not enough. A.3.3.PI develops this general sufficiency test; here the joint-state construction provides a control-specific realization.