CAD.4:5.1 - Compare rates at the same requested progression
For the discrete actuator example, assume a dedicated planner resource needs two fast ticks per result. The fast controller has a separate resource. Commands are prepared for their applicability interval; initialization supplies the first segment. The table reports model results using these assumed timings.
At progression 0.025 per fast tick, a held reference changes by \delta=N/40. At progression 0.05 it changes by \delta=N/20. The sufficient error and input bounds are derived from CAD.2, with a=1/2.
| Command and demand | N | Error bound E | Input bound | Two-tick planning time fits? |
|---|---|---|---|---|
| Held, 0.025 per tick | 1 | 0.05 | 0.025 | No |
| Held, 0.025 per tick | 2 | 0.066667 | 0.033333 | Yes |
| Held, 0.025 per tick | 4 | 0.106667 | 0.053333 | Yes |
| Held, 0.05 per tick | 1 | 0.1 | 0.05 | No |
| Held, 0.05 per tick | 2 | 0.133333 | 0.066667 | Yes |
| Held, 0.05 per tick | 4 | 0.213333 | 0.106667 | Yes |
| Joined segment, increment at most 0.05 per tick | 4 | 0.1 | 0.05 | Yes |
At the original demand, two held-command arrangements pass this sufficient input test; their compute use and tracking behavior can be compared. At doubled demand, neither of the considered held arrangements that fits the planning time passes it. The N=4 case also has the direct violating first jump shown in CAD.3. For N=2, two successive positive changes of 0.1 from rest produce an input of 1/16 = 0.0625 at the second change, also above the limit.
The segment arrangement admits the higher demand under the stated sampled model and margins. It adds a clocked reference generator and continuity checks. The comparison covers the held and joined commands tested here. It leaves the benefit of additional layers open.