Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

CAD.2:5.2 - A continuous reference segment

Now let the fast computation generate r from a timed segment and let d_k=r_{k+1}-r_k, with |d_k|\leq v_{\max}. The same plant and gain give

e_{k+1}=ae_k-d_k,\qquad E=\frac{v_{\max}}{1-a}.

The planner can still update every four ticks. What changed is the command trajectory between updates. At v_{\max}=0.05, E=0.1. Include any handover jump in the actual increment d_k. A planned increment of 0.02 and an additional jump of 0.01 give 0.03 at that tick. The same sampled bound holds while every actual increment stays within 0.05 and the initial error is within E. A command contract requiring continuous joins also requires checking continuity at handover.

If a new segment is unavailable, holding the current reference gives d=0, which remains within this command class. This is an error-bound argument for that fallback, not evidence that holding position satisfies every mission requirement.