Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

CAD.1:4.1 - Formulate the unsplit question

State the controlled quantities, objective or preference, hard constraints, operating domain, relevant disturbances, measurements and available actions. Distinguish three time quantities: the dynamics and disturbance times, the horizon over which a choice matters, and the time needed to obtain and execute that choice. A fast update is useful only if observations, computation and actuation support it.

Use a centralized mathematical formulation when it helps reveal coupling, even if that formulation is too expensive to run. It can be a finite-horizon objective with dynamics and constraints, a reach-and-avoid problem, or a reference-following requirement. It is the common comparison basis, not a promise that one optimizer must solve everything.

When a qualified simple controller is available, establish what it achieves under the stated requirements. If it already suffices, it can answer a request for a workable architecture. For a comparison, identify the benefit another arrangement would have to provide and its cost. Use a bound, analysis, operating record or trial that can settle the remaining difference.

When a qualified existing loop has adequate tracking and disturbance rejection but requested commands violate constraints, compare adding a reference or command governor before redesigning that loop. Use the joint plant-controller model, admissible initial conditions and qualified command-update rule described in CAD.Reference:4.5.1. Check whether the resulting command delay or distortion meets the task. If it does, retain that candidate; if it does not, identify the unmet requirement that a different interface, planner or controller must address.