C.40.JF:4.3 - Test the combination, not just its ingredients
Put jointly necessary conditions on one compatible basis. Recover the time intervals, resource quantities, operating and transition demands, availability restrictions, and protection limits. Before adding the demands on one provider, establish which operations must be performed separately and which one performance can supply to several recipients. Count shared work once and each separate demand in the time window in which it must be met. If sharing is undecided and would change feasibility, keep the two outcomes open.
Ask which conditions compete, complement, substitute for, or interfere with one another. Inspect common causes and shared suppliers, thresholds, congestion, delays, continuing obligations, and evidence dependencies where they can change the result. Two claims derived from the same unqualified assumption do not independently support the combination.
For a sequence, check whether the earlier transition can establish the next step’s starting conditions within the declared horizon. A planned learning result remains a condition on the later step until learning evidence for the intended holder supports it. A later resource estimate must include continuing demands inherited from earlier steps. For alternatives, preserve their separate bases: a conflict between them may rule out simultaneous realization without ruling out either alone.
Use the domain analysis when the joint question needs scheduling, engineering, safety, organizational allocation, finance, or another specialized result. An ordinary arithmetic conflict can be stated when the underlying quantities and limits are qualified. Do not infer independence, additivity, or a probability of completion from the shape of a dependency diagram.