C.39:7 - Conformance Checklist
- The sought local result and a distinction between attainment and failure are recoverable.
- An adequate existing Method or result can finish the use without invented alternatives.
- Source operations and target differences are inspected before transfer is asserted.
- A proposed connection explains its inputs, contribution and defeating condition.
- Further refinement is tied to a result-, feasibility- or burden-changing gap.
- The returned explanation, unresolved support and actual realization remain distinguishable.
- The next inquiry has a use that can warrant its effort, or the search stops.
- For a connected use, result transfer, composition, enactment, variation and replacement are distinguished where their consequences differ; independent Methods retain their direct uses.
- An explanation intended for later performance or change supplies the needed inputs, actions, reasons, conditions and returns without making the promised construction an undeclared reader prerequisite.
- A changed-condition claim identifies affected connections and retained uses; a correct construction, practical fit and worthwhile application have the evidence their distinct claims need.