C.39.MC:5.1 - Continue a Release-Method Proposal Across Two Turns
This constructed case concerns ongoing Method-architecture work on proposal P. Whole Method W and participant Methods M1 and M2 have independent identity results, and the participant qualifications remain current. P proposes a construction of W using both participants, but the claimed methodPartOf(M2,W) is unresolved: its cited procedure has not been checked for a required contribution or an admitted alternative in W’s construction. A description review can inspect the independent participant claims now. Publication is blocked because no publication decision has been obtained.
The Method engineer needs the description-review result now while keeping the whole claim visible for the next meeting. The continuation answer is:
| Current question | Relevant knowledge and condition | Answer now |
|---|---|---|
| May the retained participant claims be reviewed? | A.3.1.QM results remain applicable; review does not presuppose the unresolved whole. | Available: review those claims while preserving their statuses. |
| May P’s proposed composition of W be described as obtaining? | W and participant identities are available, but B.1.5.CM/B.1.5 need the required relations. | Unknown: recover the basis of methodPartOf(M2,W). |
| May this candidate be published? | The applicable publication decision has not been obtained. | Blocked: content review supplies no replacement for that decision. |
Using A.15.7, the engineer selects description review as the next action and commissions it. The review lead compares their participant-identity claims with the existing identity results and finds support for W, M1 and M2 as identified Methods. The material examined still supplies no basis for the proposed inclusion of M2 in W. The lead gives the engineer those findings now. The first is usable in the meeting, and the second states which construction rule still needs examination. Because the next meeting will rely on these distinctions, the engineer retains one situated result about P’s architecture question, citing the existing A.3.1.QM results rather than copying them. No formal CGUS is needed for this use.
Before the next choice, the relevant procedure is inspected. Its construction rule places M2 outside W: M2 supplies optional advice but is neither required nor an admitted construction alternative. That changes the proposed composition claim, not the independently established identity of W, M1, or M2.
The engineer returns the affected composition question to B.1.5.CM. The proposed relation set is not supported as W’s obtaining composition; retain the useful support relation and return P for correction or another proposed arrangement. The engineer can use the completed comparison with the existing A.3.1.QM identity results at the meeting. Publication still requires its own decision.
The new situated result changes the composition-claim and return content. It does not backdate a new Method, change independently established completed review Work, or announce a new structure from one new fact. If another proposed arrangement changes W’s reusable semantics, that later proposal needs its identity question.
The newly inspected rule decides the composition question and changes the uses that depended on it. The completed identity comparison remains available for its original use.