C.37:5 - Archetypal Grounding
C.37:5.1 - Qualified premises for a bounded-trial decision
MethodEngineer-ME1 must choose between keeping the current Method edition for Work item WP4 and preparing and running a one-hour trial of MethodChange-MC7. The commissioning rule admits a proposal only when its estimated total time fits a three-hour budget. The current edition fits. MC7 requires an estimated four hours of preparation before the one-hour trial. Both figures charge the same time budget.
Under C.11 the result CR7 is choose now: retain the current edition for WP4. The preparation estimate alone exceeds the ceiling. The planned hour gives the fuller estimate of five hours. This calculation settles eligibility under the stated planning rule. How long preparation would actually take remains unmeasured.
| Source considered | What the source supports | Use in this decision |
|---|---|---|
| The commissioning rule, the setup estimate for MC7 and the estimate for retaining the current edition | The applicable ceiling and the estimated time required by each option under the trial conditions. | select for the budget comparison. Reopen it if the rule, estimate, alternatives or trial conditions change. |
Trial item in WorkPlan-WP4 | A.15.2 identifies a planned one-hour slot. A.10 path P-WP4 supports that limited claim (pass). | select for estimating the full trial time. The four-hour setup estimate is already sufficient to exclude MC7. To report that the trial took place, use adequate grounds for the occurrence, such as direct observation or a reliable Work record. |
Workflow diagram in MethodDescription-MD5, edition 5 | A.3.2 identifies the MethodDescription and its proposed order of work. Path P-MD5 supports reading that order (pass). | decline as a premise for choosing on budget. The engineer can use the diagram to prepare an eligible trial. Revisit the estimate if a change of order changes the work it covers. |
WorkRecord-W19 about the earlier Work-W19 | A.13 and A.15.1 establish the earlier assignments and Work. The record identified under C.2.1 reports rework in those conditions. Path P-W19 supports that observation within its comparability limit (degrade). | decline for the budget comparison. The record explains why the change was proposed. It supplies neither the new setup estimate nor evidence that MC7 prevents the old breakdown. |
Raise the ceiling to five hours with the estimates unchanged. MC7 now meets the budget rule. If the engineer was asked only whether the trial fits, they can answer yes on the estimates. Choosing it over the current edition would require a reason to prefer it among the eligible options. To guarantee completion by the deadline, establish that every admissible duration meets it. To rule out timely completion, establish that every admissible duration exceeds it. A reliable upper bound at or below the deadline establishes the first claim. A lower bound strictly above it establishes the second. A five-hour upper bound against a three-hour limit leaves open the possibility of finishing sooner. An estimate alone settles neither claim.
C.37:5.2 - Failed diagram use
A release team receives a polished architecture diagram and wants to authorize deployment. E.24.PUB establishes that the diagram edition is available through a current carrier. C.2.P.DR repairs one route-shaped arrow that had been read as operational authority. Neither result establishes view conformance, a representation correspondence, runtime structure, evidence reliance, or deployment permission.
Until the needed direct subject result, reliance basis, and permission or gate result are available, the row is unresolved. Use A.10 when the source-to-use account remains implicit or must be replayable. Visual polish and provenance cannot upgrade it.
If the direct release gate or permission pattern instead returns a negative result because its required basis is absent, the row is decline; classification, publication, provenance, and repair facts cannot override that direct result.
C.37:5.3 - One decision now and a later reader’s need
The engineer can finish the current comparison by giving the planning rule, the estimates and the resulting choice. The source of the four-hour estimate matters even though the workflow diagram and the earlier work record have identifiable editions. Neither supplies that estimate.
A later reviewer can use the estimates, their coverage, the budget rule then in force and the alternatives to reconstruct which proposals were eligible. To establish the decision that took effect, apply the operative rule if it settled the outcome, or recover the decision that its authorized holder made. To say the holder chose on the basis of these estimates, establish that they used them. They might have received an independent estimate with the same result. If the question concerns why MC7 was proposed, recover the earlier rework evidence used for that proposal and its comparability limit. One decision record can already contain the grounds needed for several of these questions.