C.33:12 - Relations
- Builds on:
A.22,C.30,C.30.AD,C.30.ASV,C.32.P2S, andC.32. - Uses:
C.2.8for extractable structural amount in an expressed episteme;C.29when choosing, transferring, or relying on a mathematical representation remains unresolved;C.16,C.25, andC.32.ACEwhen a claim about captured or lost structure is recorded as a measurement, Q-bundle slot, criterion, or eval reading. - Coordinates with:
C.30.STRAT,C.30.TFS-REL,A.6.M,A.6.3.NAR,C.31,C.31.ASAP,C.32.PAD,C.32.ADR,G.5,C.18,C.19,E.18,F.9, andF.15. - Boundary: C.33 governs structure-capture adequacy and missing-structure return for a declared architecture use. It does not ground architecture, select candidates, decide projects, publish records, measure values, supply evidence or assurance, authorize work, or claim realization.