| Record-before-decision drift | The account preserves the decision relation and its actual or proposed status; an ADR template does not make the decision. |
| Description-as-decision drift | Architecture descriptions remain C.30.AD objects; PAD records the decision relation that may cite them. |
| Metric-winner drift | Eval readings and metrics can inform trade-offs but do not select or decide by themselves. |
| Method-structure collapse | Method-use instructions and intended target structures are both recorded and kept distinct. |
| Work-split loss | Structures fixed by the decision, refinement scopes left open, and source-return conditions are explicit. |
| Evolution lock-in | Supersession and reopen conditions are part of the decision relation. |