Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

C.32.P2S:12 - Relations

Builds on:

PatternContribution
A.1 and A.1.SCRAn existing system boundary.
A.15.6Project system-of-interest designation and intended-system separation.
A.1.STM:4.1–4.3The shared project SoI basis and the local architectural subject’s contribution to it.
A.1.STM:4.4A missing dependency when that basis is already sufficient.
C.22.2Problem-side recovery.
C.30, C.30.AD, and C.30.ASVGrounded architecture, architecture-description adequacy, and structural-view adequacy.
C.33 and C.34Structural-information capture and preservation.
C.35Recover the kind of a generated or discovered result and assess its adequacy for the next architecture use inside the flow.
C.32Candidate architecture synthesis.
C.32.HCS, C.32.ACS, and C.32.ACECharacteristic starter heads, project criteria rows, and eval programs.
C.25Q-bundles.
C.31 family patternsModularity, reusable structure, and scale preference.
C.29Unresolved mathematical representation choice, transfer or reliance.
E.17A source-backed publication face and source return.
E.24.PUBThe publication occurrence and audience availability.

Uses:

PatternContribution
A.22.CGUSThe P2S unfolding-structure block when problem pressure, structure uncertainty, candidate synthesis, decision linkage, work linkage, and actual-structure feedback must remain inspectable as one constraint-governed unfolding structure.
E.18.3, C.30.TFS-REL, E.18, and A.3.4When architecture pressure concerns transformation-flow or bounded change.
C.30.ILC, C.32.MLAO, and B.2 family patternsWhen cross-scope, interlevel, interlayer, meta-holon, emergence, or reidentification pressure changes the candidate frame.
C.32.CONWAYWhen co-synthesis of influence-source and transformed-side architecture content is current.
C.32.FAILWhen a recognizable architecture-synthesis failure becomes a repair action.

Patterns for the next questions:

PatternContribution
A.19.CPM, A.19.SelectorMechanism, C.18, C.19, G.5, and C.11Comparison, selection, archive, front, pool policy, selected-set result declaration, and local choice.
C.32.PAD, C.32.ADR, and C.32.ADAProject architecture decision, ADR-like projection, and decision adequacy.
C.30.ADArchitecture descriptions.
A.6.3.NARArchitecture-mediated narrative renderings.
E.17Source-backed publication faces and source return.
E.24.PUBPublication occurrences and audience availability.
A.3.1 and A.3.2Method identity and MethodDescription membership, respectively.
A.15, A.15.1, A.15.2, and A.15.5Method-work alignment, performed work, work plan, and readiness.
A.3.4Each actual bounded change.
The pattern for the predicate, or A.6.RCDWork-to-change claims and blockers.
A.15.PRODSeparate local production-work, entity-identity-inception, and production-completion claims.
C.16, C.25, C.29, C.32.ACE, E.23, G.11, and E.18Measurement, Q-bundle, mathematical lens, eval, improvement, currentness refresh, and transformation-flow slice-local refresh.

Boundary: Use C.32.P2S for the connected project-local architecturing transformation flow from architecture-relevant pressure to subject-side actual structures recovered under A.22 from obtaining facts, and then to feedback.

C.33, C.34, and C.35 deepen the structural-information slot group already present in P2S; they do not move the whole connected flow out of P2S.

C.32.P2S does not define or test architecture claims, architecture descriptions, structural views, candidate palettes, comparison, selected-set result declarations, decisions, ADR-like publications, publication forms, publication-use claims, methods, Work, measurement, eval, evidence, assurance, gate, release, improvement, currentness refresh, or formal structural-information theory.