C.32.ACS:12 - Relations
- Builds on:
C.32.HCS,A.17,A.18,A.2.6,A.19,C.16,C.16.P,C.25,C.30,C.30.P,C.31,C.31.ASAP,E.13,E.22, andE.23; uses A.1.1 only when a selectedBoundedModelUseStructurechanges one row’s interpretation. - Receiving uses:
C.32.P2Sproblem-to-structure architecturing flow,C.32candidate synthesis,C.32.MLAOmultilevel residual work,C.32.CONWAYcorrespondence frames,C.32.FAILrepair cues,C.32.ACEeval programs,A.19.CPMcomparison inputs,A.19.SelectorMechanismselection inputs,C.11local choice inputs, inputs for selected-set result declaration underG.5, source-backed publication-face and source-return inputs underE.17, publication-occurrence and audience-availability inputs underE.24.PUB, and architecture-decision inputs forC.32.PAD. - Starter-pack boundary: Use
C.32.HCSwhen the project needs a holon-family starting set before criteria rows exist. - Q-Bundle boundary: Use
C.25when the architecture characteristic is a composite quality family with several measures, scope slots, mechanisms, statuses, qualification windows, or evidence. - Scale-preference boundary: Use
C.31.ASAPwhen a project claims that one architecture alternative is preferable over another under a declared scale window; the ACS row supplies a criterion, not that preference. - Eval boundary: Use
C.32.ACEwhen a project wants eval-program framing over declared rows, Q-Bundle slots, candidates, or selected-structure changes; state each typed result separately under the pattern that defines and tests its kind and exact predicate or constraint. - Measurement boundary: Use
C.16when a reading, coordinate, unit, threshold, score, or cross-case comparability claim is made. - Structural-information boundary: Use
C.33orC.34when the issue is captured structure, lost structure, or preservation adequacy before a criterion row exists. Use C.32.ACS only when that structural-information or preservation concern becomes a declared architecture-characteristic criterion row. UseC.35only for kind restoration and architecture-use adequacy of a generated or discovered result before C.32 or ACS uses a criteria-bearing claim based on that result. - Proxy boundary: Use
E.13when an optimization indicator, score, eval result, or dashboard state begins to replace the declared architecture concern. - Synthesis boundary: Use C.32 when characteristic pressure is recoverable and the next useful work is to synthesize candidate structures. Retain missing criterion bindings as unresolved; do not treat an exploratory candidate as an established improvement.
- Decision and publication boundary: Use
A.19.CPMfor comparison,A.19.SelectorMechanismfor selection,C.11for choice,G.5for selected-set result declaration, andC.32.PADfor an architecture decision. For publication, useE.24.PUBfor the publication occurrence and audience availability, and E.17 when a source-backed face and source return are needed.