C.31.ASAP:4.3 - Architecture scale-preference rule
When the commission values stable reusable structure, compare how well the alternatives preserve it over the declared scale window, subject to safety, law-domain and assurance requirements. If the question concerns another characteristic, carry the alternatives through the permitted operating conditions and compare them on that characteristic. Select the functional, flow, control, interface, work-template or evidence structure and any learning-transfer characteristic relevant to that comparison.
Define the advantage that would change the recommendation and for whom. A supplier’s engineering effort, the purchaser’s price and the installer’s work can change independently. For a combined cost, include the work the arrangement transfers to others within the stated scope and count shared work once. Compare both alternatives for the same deliveries under the conditions that affect that advantage. Separate a one-time investment from work repeated at each installation or each new interface type. When deciding whether to commission a shared design, count the preparation it requires. When deciding whether to keep using one already built, compare future costs and commitments that the choice can still change. The original expense remains part of the investment history. More deployments at an established site may require none of the qualification work that a first deployment in a new jurisdiction requires. Check where the two alternatives tie or change order. When different admissible mixes of sites give different recommendations, state which mix supports each and what is known about the proposed rollout.
Observations can support a comparison for the conditions examined. A binding rate, an engineering bound or a supported construction can also establish an answer for the entire stated range under its assumptions. Record the observations or the applicable derivation and its assumptions. A quotation or bound that orders the alternatives throughout a window can be cited in comparisonBasisRef even when neither slope is known. An advantage in price throughout a window establishes which quote is cheaper. To claim its price grows more slowly, compare the changes in price. When an untested premise could reverse the preference, state what depends on it. A reason for skipping a probe supplies no evidence about its outcome. An applicable derivation can already settle the question. Conflicting characteristics need the preference or decision rule for the work in question.
C.31.ASAP defines the scale-preference claim and its boundary. Use G.9 for a parity claim and A.21 for a gate claim; the candidate, comparison, set-declaration, and choice uses are distinguished below.
A scale-preference claim may inform C.32 candidate generation or supply one input to an A.19.CPM comparison by naming the scale variable and window, the grounds for ordering the alternatives, and any structural uncertainty or exception that could reverse that order.
Use:
C.32to construct the candidate architecture palette;A.19.CPMto compare alternatives;G.5to declare a selected-set result;C.11to make a final local choice; andC.32.PADto record a project architecture decision.
For audience availability, use E.24.PUB for the publication occurrence, form, carrier, audience and bounded use; use E.17 when a source-backed face and return are needed.
Apply the relevant evidence, assurance, gate, or release definition and test only when that claim is current.
When the same scale-sensitive pressure must also become a project criterion, C.32.ACS creates a separate row for the characteristic or Q-Bundle slot, bearer, scale form, and use class. That row may supply declared input to an ASAP preference. Use C.31.ASAP to state which alternative is preferable under the scale window; use C.32.ACS to admit and classify the criterion row as an optimization indicator, guardrail, or context-only row. Keep the preference record and criterion row separately referenced.