| LCA-as-proof | The text says the control stack proves safety, stability, or gate readiness. | Keep the control view and use the relevant dynamics, evidence, assurance, gate, or safety pattern for each proof or claim named by value. |
| Control-layer-as-generic-level | Layer, level, tier, or stack is used without a direct control relation, inter-layer relation, rate band, or B.2.5 supervisor-subholon relation. | Apply C.30.STRAT; use C.30.LCA only after a control-specific relation is recovered. |
| Agentive episteme, kind, or assignment | A policy, model, dashboard, local system-role kind, assignment, or architecture note is said to watch, decide, plan, or adapt. | Recover the direct control relation and participant meanings. For a dated action asserted as Work, recover the performer through A.13 and admit the U.Work occurrence independently through A.15.1. Ordinary instrumental wording alone does not assert such an occurrence. Add assignment and F.6 only when precise assignment-bound attribution is expressly consumed; keep publication, source-to-use, work-reliance, authority, responsibility, gate, safety, and evidence relations separate. |
| Transformation-flow and LCA substitution | A transformation-flow graph expression is treated as control architecture, or an LCA diagram is treated as the transformation-flow graph expression. | Recover both selected structures and description epistemes separately; use E.17.0 only for viewpoint conformance. |
| Hidden rate claim | Multi-rate control is used to claim adequacy, but the timing relation needed by that property is not established. | Recover the stated rates, their relations and bounds. Use C.27.TA for temporal aspects or rate bands, C.27 for an action-guiding temporal claim, and the applicable dynamics or control rule for stability or performance. Merely reporting different update periods need not assert adequacy. |