C.30.ASV:4.8 - Worked slices
Runtime degradation. A team wants to explain why service sometimes becomes unavailable during failover. It follows the promised service across the handover and asks which participants can still serve the same request with the required state. The view below is useful where runtime interactions, control, placement and the available observations can distinguish rival accounts. An account of an actual outage also needs grounds that identify the conditions on that occasion.
Runtime degradation slice:
selected structure kinds:
RuntimeInteractionStructure
ControlStructure
InformationDataStructure
PlacementDeploymentStructure
EvidenceAssuranceStructure
first architecture move:
recover runtime interaction topology, control relation or failover relation,
state custody, placement relation, locality relation, evidence relation, and observability relation
nonAdmissibleUse?:
deployment diagram as runtime proof,
observability dashboard as evidence sufficiency,
green indicator value as gate authority or release authority
Use C.24 when a fixed action or option needs budgeted tool-call planning or replanning. Use A.15.1 for Work and identify any call-graph structure under its applicable pattern. Keep those claims and uses separate from the architecture structural-view claim.
CPS or plant architecture. Suppose an engineer must explain how separation of plant sections can be maintained during a control change. Select the paths that could connect the sections and the conditions under which the control can operate them. The views below illustrate what may be needed when a drawing omits one of those relations.
CPS and plant architecture first recovery:
MaterialSpatialStructure:
physical separation, adjacency, energy path or material path
ControlStructure:
controller, plant, observer, supervisor, control rate
InformationDataStructure:
sensor data semantics, provenance, custody, source return
PlacementDeploymentStructure:
locality, environment, jurisdiction, safety separation
EvidenceAssuranceStructure:
evidence reuse boundary and affected structures
first architecture move:
relate physical separation, sensor data semantics, control rate,
placement boundary, and evidence reuse
correspondenceOrLossLine:
record which separation, data, control-rate, placement, or evidence-reuse
relation is preserved by the slice and which structure is hidden or lossy
stop condition:
the account explains continuity or loss of the required separation under the permitted changes, or identifies the unresolved path that changes the answer
Chiplet or device architecture. A team wants to know whether a replacement can meet the agreed interface and timing conditions in its assembled package. A packaging diagram or interconnect sketch may describe several relevant structures.
Chiplet and device architecture first recovery:
MaterialSpatialStructure:
packaging, adjacency, thermal path, energy path
TransformationFlowStructure:
interconnect topology, data flow path, energy flow path, or signal flow path
ModuleInterfaceStructure:
interface specification, protocol, conformance boundary
PlacementDeploymentStructure:
physical locality, substrate, host environment
first architecture move:
separate interconnect topology, packaging path, thermal path, or energy path,
interface specification, and evidence boundary and conformance boundary
correspondenceOrLossLine:
record the preserved relation among interconnect, physical package,
interface, and placement, plus any benchmark or packaging-view loss
stop condition:
show whether a permitted replacement preserves the required interface and timing in the assembled package,
or identify a missing path or condition that could change that conclusion
Organization or operating-model architecture. Suppose colleagues need to explain how an approved handover keeps a service available when participants change. Follow the work that the recipient needs across the handover. Identify which responsibility, enactor, information and evidence relations account for that continuity. A question about one assignment can use just its relevant relations.
Organization and operating-model architecture first recovery:
AllocationResponsibilityStructure:
direct responsibility relation occurrences and enactor-allocation boundary;
if the responsibility predicate is unavailable, missing-governor
WorkMethodStructure:
repeatable work method and exception-handling relation
InformationDataStructure:
information custody, state residence, provenance
EvidenceAssuranceStructure:
evidence reuse, approval, audit trail, source return
first architecture move:
relate the responsibility and enactor-allocation relations, work repeatability,
information custody, and evidence reuse
correspondenceOrLossLine:
preserve the direct responsibility relation and its participants;
record separately any local system-role kind and any System-classification judgment,
assignment, enactor relation, complete Work basis, concern or affected-party relation,
information, and evidence structures,
plus any org-chart or work-method-diagram loss
stop condition:
explain how the next participant can continue the required work under the permitted changes and why the relevant connections endure,
or state which missing connection leaves that explanation open
Evidence reuse across product variants. A certification or test package reused across module variants may be architecture-relevant as an evidence-and-assurance structure view, but it is not an assurance verdict:
Evidence reuse across product variants:
structureKindRef: EvidenceAssuranceStructure
structuralFeature:
evidence package shared across module variants
affectedQBundleSlot:
assurance maintainability or release readiness
architectureMove:
name affected structures, variant boundary, hidden view losses,
and source-return condition
claimPatternRefs:
A.10 for bounded source-to-use reliance, G.6 for citable provenance paths, B.3 only for a named assurance claim; the applicable result pattern for evidence sufficiency
nonAdmissibleUse?:
evidence-structure view as assurance verdict
Organization service architecture. A service organization sketch that shows teams, handoffs, escalation points, and dashboards is not the organization architecture by itself. First recovery can require:
Organization service architecture first recovery:
describedHolonRef: service organization or service-delivery system
candidateStructureKindRefs:
WorkMethodStructure:
method arrangement, work-plan boundaries, exception handling, and performed-work records
AllocationResponsibilityStructure:
admitted direct responsibility relations and their participant split, enactor-allocation relations,
escalation relations, and separately any local system-role kind,
System-classification judgment, and obtaining assignment;
use missing-governor when the source says responsibility but no direct predicate is admitted
InformationDataStructure:
ticket state, customer record custody, dashboard source, and source-return condition
EvidenceAssuranceStructure:
audit trail, service-level evidence relation, assurance claim, and gate or release record only when those claims are being made
C30ASVBoundary:
ASV names selected structure and view boundary; staffing decision, work authority, evidence sufficiency, assurance, and service-quality claims use their applicable patterns
AI agent diagram. A “planner-memory-tools” diagram is not the agent’s architecture by itself. It may start first recovery as a structure-kind set, without minting an AI-domain ontology:
AI-agent architecture first recovery:
RuntimeInteractionStructure:
interactions among the model, tools, memory, planner, evaluator and any other participants in the configuration under study
InformationDataStructure:
memory scopes, data custody, provenance, retention,
context-window relation and source-return relation
SecurityTrustBoundaryStructure:
untrusted content channels, prompt-injection or instruction boundary,
tool authority, secret-bearing contexts, memory custody crossing and data custody crossing,
output handling, supply-chain or update channel
ModuleInterfaceStructure:
tool specs, API specs, and interface specs and substitutability limits
EvidenceAssuranceStructure:
evaluation results, any approval required for this use, evidence decay, incident feedback
admissibleArchitectureMove:
split runtime interaction, information, security boundary, module-interface, and evidence-assurance claims before relying on the diagram
correspondenceOrLossLine:
record the preserved relation among runtime topology, information custody,
security boundary, module-interface, and evidence-assurance structures,
plus any diagram or evaluation-harness loss
claimPatternRefs:
C.30.TFS-REL when an E.18 flow relation is being used,
A.6.M module-relation repair for tool, API, or interface relation claims,
A.10 for bounded source-to-use reliance, G.6 for citable provenance paths, or B.3 only for a named assurance claim,
C.24 for call planning after the action or option is fixed, E.16 for autonomy budgets and enforcement, A.20 for internal-constraint checks in transformation flow, or A.21 for gate decisions; use the defining pattern for any separate tool-call authority claim
stop condition:
ASV contains only the structural-view record; evidence sufficiency, assurance, gate, autonomy, and tool-call authority claims use their applicable patterns
A catalogue team might entrust a service with publishing entries once specified checks pass. A different agreement can reserve the publication decision to the collections editor, or require decisions by two collections acting jointly. Recover the governing terms and the acts they require before crediting a participant with admission. A permitted publication can still be awaiting execution.
Structural AI-agent security is architecture structure when these structure kinds change the next architecture move. When the claim is instead about latent representation, decoding, or effect adequacy, keep the phrase as a reduced-use source cue and use the applicable representation, decoding, or effect-adequacy pattern.
Generated code-agent relation graph. A probe output can supply a diagnostic description or representation. To claim an architecture structural view, establish its description identity, selected-structure subject and E.17.0 conformance. Recover relation meanings and the source basis for the claims being made. Distinguish observed, inferred or unknown relations and unexplored regions where that distinction changes the use. If the extractor found calls and the designer identified a missing dependency on shared data, the completed map can support a change review. The designer’s contribution is the dependency they identified and supported. Verifying supplied edges is a different contribution. Add a source-return condition when hidden distinctions matter. Claims about an agent’s internal belief or the safety of a code change need their own grounds.
Neural-network block replacement. For a neural-network modification, such as substituting an attention block or changing MoE path selection, recover which selected structure or relation changes and use C.30 for its architecture relevance. Identify flow, module-interface, preserved or lost structure, characteristic and source-use claims when they matter to that change. Establish any separate decision or evidence conclusion under its own rule; a modification need not assert every one of these claims.