Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

C.29.3:7 - Conformance Checklist

Apply the checks to the realization and use. Their answers can remain in the working calculation, diagram or operating explanation.

CheckWhat must be recoverable
CC-C29.3.1 - Required resultThe computation, admitted inputs and receiving equality, bound or continuing property.
CC-C29.3.2 - Input preparationA way to prepare each claimed input, with its range, initial state and consequential loss.
CC-C29.3.3 - Executing actionsSystem actions and state changes that perform the operations, including relevant intermediate states and shared access.
CC-C29.3.4 - InterpretationThe obtainable state or indication and the relation that turns it into the result used.
CC-C29.3.5 - Scope of comparisonThe comparison of preparation, operation and readout has grounds for the claimed inputs or histories. A case can expose an uncertain connection. A claim about completed operation has evidence for the particular work.
CC-C29.3.6 - Changed conditionsWhich preparation, execution or interpretation must be reconsidered when range, timing, ordering or uncertainty changes.
CC-C29.3.7 - Usable outcomeA sufficient realization or interpreted consequence, or a named incompatibility with the next repair. The strength of the claim matches its grounds.