Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

C.29.2:7 - Conformance Checklist

Apply these checks to the computational claim being made.

CheckWhat must be recoverable
Answer and scopeThe input class, required answer and any accuracy or interaction condition; an output characterization is distinguishable from its obtaining procedure.
Represented distinctionsThe input meaning, computational state and output interpretation support the required operations. Where several inputs share a state or receive the same answer, that choice remains adequate for the commissioned work.
Available operationsWhat each consequential operation does and where any non-elementary construction comes from.
Obtaining constructionAn executable ordering, an applicable solver for declared relations, another specified computational behavior, or a substantive missing-construction task.
ArgumentThe construction has an argument for its claimed range, including termination or response properties when claimed. A requested execution has its result. A worked input can exhibit a disputed step. An obstruction has an argument establishing its scope.
AccuracyThe error relation or probability guarantee used by the receiver and the arithmetic, approximation, sampling and interpretation conditions that support it.
ResourcesThe relevant element/operation counts, per-element or per-operation costs, size parameters and material preparation/readout costs.
Result boundaryA qualified answer, restriction or obstruction; no unsupported promotion of one trace, failed representation or simulated execution.
ReturnThe failed connection and the contribution that can change it, without requiring further work after a sufficient result.