Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

C.27:9 - Consequences and Reopen Conditions

C.27 makes intervention-sensitive temporal claims inspectable. An adequate state or rate reading can remain sufficient; a stronger forecast needs its temporal and effect grounds.

Refresh follows the receiving use:

  • include a reopening condition when later reliance depends on it;
  • a transferred claim may need a validity interval, current evidence or another stated condition;
  • G.11 carries refresh orchestration, and B.3.4 carries evidence decay and epistemic debt.

Reopen when, for example:

  • a claim, sampling, intervention, baseline, follow-up, or validity window changes;
  • a rhythm bearer, temporal reference, rhythm window, proxy, or coupling changes;
  • effort, resource, actual System actor, assignment, authority, or availability changes;
  • resistance changes because tooling, work mix, queue topology, constraints, or service demand changed;
  • a measure becomes a target, gate, dashboard, incentive, or public comparison;
  • cross-scale transfer is attempted;
  • results reverse, overshoot, oscillate, stall, or become unstable;
  • hidden queues, rework, burnout, quality loss, service demand, safety demand, or coordination debt appear;
  • the use changes from local diagnosis or planning to benchmark, causal, assurance, promise-like, publication, gate, or formal-model use;
  • a coasting, braking, recovery, or stabilization claim outlives its evidence or assumption.