Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:25:09 UTC

C.24:7 - Conformance Checklist

  1. Each result states what fixes the planned action under the conditions of use. Cite the operative instruction or commitment, applicable domain prescription, A.15.7 decision or C.11 choose-now ChoiceResult, including their combination where needed. A WorkPlan alone supplies no permission or authority. A directly commissioned or prescribed action requires no intervening decision wrapper.
  2. Every planned step names an A.3.1-admitted Method that realizes or supports the fixed action. The plan shows how the contributions can supply the whole promised result under the applicable conditions. The action basis fixes the action or option; selecting it does not establish Method identity. Route-description refs remain separate and optional.
  3. The plan records its applicable time, compute, cost or risk ceilings and stop or replan conditions.
  4. C.18 candidates or front material and C.19 live-pool treatment may inform the action basis but do not admit Methods; C.24 owns only planning and replanning results.
  5. A scale branch first cites one C.19.1 probe result, then any selected comparison or Scale-Audit result; a BLP-waiver remains separate from evidence.
  6. Every vendor-bound ATC.CallRouteDescription identifies source scheme, exact edition, intended use, and selected Method; an arbitrary profile, adapter, or Bridge cannot substitute.
  7. Each current policy or constraint ref resolves to its C.19, C.19.1, B.3, or domain-defined object; a plan with no such branch remains valid.
  8. A CheckpointReturn states tested Methods, evidence, burned and residual budget, next action, and commit trigger.
  9. Actual call claims retain their A.15.1 Work grounds. A receiving use that needs replay also retains the relevant plan, budget delta, source editions and G.6 trace refs.
  10. A causal action-use branch uses the current C.28 question, support-component, and support-result contract and grants no downstream authority.
  11. The ordinary quick path remains readable without ontology or assurance apparatus.