C.24:12 - Relations
A.3.1supplies admitted Method identity; neither decision branch admits a Method merely by selecting an action.- The steering Method in
A.15.7is used to reach the situation-responsive decision cited throughsituationResponsiveDecisionEpistemeRef; when this plan relies on the decision, its episteme has the identity conditions defined in C.2.1. - A C.11
ChoiceResultwhose result ischoose nowis cited throughfixedOptionChoiceResultRef. C.18supplies generated candidate or front material, andC.19suppliesPoolPolicyResultorEmitterPolicyonly when live-pool treatment still constrains the plan. Neither admits a Method.C.19.1supplies the scale-claim probe, any selected comparison or Scale-Audit result, and any separate local policy orBLP-waiver.A.15,A.15.1,A.15.2,A.2.1, andF.6keep Method, description, plan, Work, performer, and attribution distinct.G.6supplies the trace representation cited byATC.CallGraphRef.B.3supplies one bounded assurance result only when a named assurance use is current.C.28supplies causal-use support when the plan is used for causal evidence, intervention, policy, fairness, or counterfactual work.C.27evaluates temporal claims about speed, narrowing, recovery, or stop/replan rate. More calls or faster narrowing is not success by itself.E.23may use C.24 plans and checkpoints inside improvement Work; C.24 does not restate the improvement loop.E.10.MOVE,E.11.PUR, andA.15.5recover project moves, pattern-use recommendations, and work-entry readiness when those questions are not plan-local.