C.24:0.2 - What this buys
- one small, tool-neutral plan that cites the accepted action basis;
- visible budgets, stop conditions, and replan triggers before calls are made;
- recoverable call facts and provenance when later use needs an execution account; and
- a checkpoint explaining whether to probe again, stop or proceed along an applicable route, and who still needs to decide.
Primary working object. One ATC.CallPlan : U.WorkPlan. Each step selects a U.Method. A route description may help locate or constrain that Method, but remains a separate U.MethodDescription. Actual calls are dated U.Work and remain outside this planning result.
First useful move. Recover what fixes the action and its completion conditions. An accepted one-off commission may already name the required result and recipient while leaving the route for the planner to choose. Establish which required results are already available and what still has to be done with them. If a usable result can be delivered as ordered, plan its delivery. If the order requires a fresh performance, include it. Reuse an adequate known route for the remaining work.
Otherwise, work backwards from the required result to admitted Methods and their needed inputs, then follow the proposed route forwards from the available inputs as in section 4.1.
Return the supported ordered calls, applicable budget and stop or replan conditions, or the particular missing contribution or condition. Add route-description refs where they are needed to understand or qualify the route.
Not this pattern when. Use C.11 while fixed-option choice is unresolved, C.19 while treatment of a live pool is unresolved, G.5 when the current task is selector-facing result declaration, A.15.5 for work-entry readiness, and A.15.1 when the question is what Work actually occurred or which Method it enacted.