C.22.2:4 - Problem, Task, Method, Work, and Result Split
ProblemCard remains usable while a method is unknown, contested, or not yet selected. A known method does not make the card ready while any core Thin item in C.22.2:2.1 remains unstable. If the problem-side episteme and method are accepted and only planned execution remains, apply A.15.
| Term or local name | Current FPF recovery | Local disposition |
|---|---|---|
Problem | Ordinary wording, ProblemCard claim content, or actual PFR according to the sentence | C.22.2 governs the card; C.22.PFR governs the actual relation. Label alone decides neither. |
ProblemCard | C.2.1 episteme about one joint EntityOfConcern | Compact problem-side result before P2W; not a work request or world-side Problem. |
ProblemProfile | C.2.1 episteme used by a named receiving selection use | One episteme can serve as both ProblemCard and ProblemProfile when it satisfies both uses and C.2.1 constitution; TaskSignature membership and assignment remain separately tested under C.22. |
TaskKind, TaskFamilyRef, TaskSignature | C.22 selector-facing declaration content and episteme | Downstream typing values; not WorkPlan entries. |
TaskSignatureAssignmentRelation | Obtaining relation among exact problem-side episteme, TaskSignature, and receiving-use episteme | Separate from all three participants and from card fields. |
| Method-family selection claim | G.5 comparison or selection result | Not a card field and not PFR cessation. |
U.Method, U.MethodDescription | Method and method-description values | Governed by their direct method patterns. |
U.WorkPlan and its declaration-local SlotFillingsPlanItem content | Intended Work and planned-filling rows addressed only through that WorkPlan | Defined and tested by A.15.2 and A.15.3; not a TaskSignature or ProblemCard. |
U.Work | Performed dated Work | Governed by A.15.1; its record or evidence is separate. |
| Result, measurement, assertion, evidence, or reliance | Output or claim governed by C.16, C.2.1, A.10, G.6, B.3, G.11, or its direct subject pattern | A claim-bearing result can supply card content or support. It can serve as the card when it satisfies the card’s C.2.1 constitution and problem-side use; other results are represented by claims about them. |
Use C.22 to prepare the TaskSignature from the exact problem-side episteme or ProblemProfile needed by one receiving use. Report the adequate signature actually adopted for the stated problem-side episteme and use under C.22:5.2. Another adequate description can remain available. If adequacy or adoption is unresolved, identify the candidates and the missing grounds. When the question becomes selection, planning, performed Work, result, gate, evidence, or reliance, apply its governor instead of expanding the card.