C.22.2:25 - Relations
- Builds on:
C.2.1,E.2,E.9,E.10,C.2.P,A.6.P,C.16.Q,C.16,A.19,C.22,C.25,C.29,G.5,G.9,A.6.3.RT, andA.6.4. - Coordinates with:
C.11,C.18,C.19,C.22.1,C.22.PFR,C.24,C.27,C.28,A.15,A.15.5,A.21,E.16,G.6,G.11,A.10,B.3,E.17,E.17.ID.CR,A.6.3,F.9,E.18,E.18.1,C.32.P2S, andE.10.MOVE. UseC.22.PFRwhen actual Problem obtaining or identity is current. UseC.32.P2Sonly when a problem-side record exposes architecture pressure that must continue into selected structures, candidate synthesis, decision, realization, actual-structure feedback, or refresh.