C.22.2:23 - Downstream Cue Export
ProblemCard exports problem-side claim content, not authority over downstream use.
The compact export contains:
- problem signal and exact signal reference;
- one joint EntityOfConcern, effective ReferenceScheme, and ClaimScope;
- claim family and polarity: actual-PFR assertion, anticipated-condition claim, method-availability or solvability claim, or another named direct claim;
- the observation, need or constraint that warrants addressing the concern independently of a proposed solution;
- improvement check or acceptance probe when needed, or the gap that prevents P2W-ready use;
- one next use and its disposition: reviewable-only,
P2W-ready,abstainOrNoChange, refresh, retire, archive, or subject-pattern cue; - current qualification window, exact PFR, source-set, A.15.6 composite or component Work, or representation reference only when independently governed and relied on; and
- problem-formulation follow-up reason, validation boundary, freshness condition, and stop only when the receiving use relies on them.
Choose the next pattern by the receiving question:
- For P2W carry-through, use E.18.1 with the accepted problem-side distinctions.
- For TaskSignature constitution and assignment, use C.22.
- For selector-facing selected-set use, apply G.5 when that relation is current.
- When the missing contribution is development of reusable material through feasible variations, use C.40; use C.18 to preserve the generation or archive account when needed.
- For intended or performed Work, use A.15 only after its object is current; when the question is whether intended Work may enter its boundary, A.15.5 governs
WorkEntryReadiness@Context. - For evidence, gate, autonomy, or any other claim, apply the direct pattern; the whole card never carries that claim by itself.