C.22.2:20 - Worked Slices and Anti-Cases
C.22.2:20.1 - Five-Case Worked Slices
These rows are recognition slices, not complete Thin cards. Before using one, complete the Thin contract in C.22.2:2.1; add the relation cues shown here only when they change that card’s next use. The compact filled Thin example follows in 20.1a.
| Case | Problem-side signal | Repaired card use | Boundary preserved |
|---|---|---|---|
| AI and human task transfer rework | Repeated rework appears after transfer between human and agent. | Stabilize signal, EntityOfConcern, effective ReferenceScheme, ClaimScope, acceptance probe, and safe-call or Work relation before another delegation. | The card is not a prompt retry instruction and does not justify another delegation. |
| Musical mastery tempo drift | Practice tempo drifts away from the intended mastery band. | State the temporal claim, practice scheme and scope, acceptance probe, and C.27 relation when tempo, rhythm, recovery, or learning rate changes the next use. | A trend line is not an intervention model or evidence of mastery. |
| Customer-service escalation after a policy or interface change | Escalation volume rises after the change. | Stabilize affected customer hand-off, acceptance probe, risk boundary, measurement relation, and causal-use relation when that relation is being made. | Escalation volume is not an automatic fix request, staffing plan, rollback order, or causal proof. |
| Literature-synthesis anomaly before method selection | An anomaly does not fit current category labels. | Preserve rival formulation, EntityOfConcern, evidence need, bridge, representation, or mathematical-lens relation when that relation is being made, and next discrimination action. | The anomaly is not proof for a new theory or a selected research method. |
| Selected-set candidate before P2W | A retained candidate from a front or pool looks promising. | Preserve sourceSetRef, source-set kind, selection or retention criterion, declared next use, and only the currentness or window on which that use relies. | Set membership is not selected-solution proof, priority score, or work authorization. |
C.22.2:20.1a - Compact P2W-ready Disposition Slice
Consider a support team seeing repeated reopened hand-offs after a new interface policy. Its source episteme SupportHandoffPolicy-E7 contains the two clauses compared below. A colleague proposes rewriting the escalation workflow. The support team has been asked to establish what the policy requires to happen to a pending case. Clarification of that rule can complete this inquiry. If an authorized requester has also commissioned a revised workflow, the same clarification guides its development and the revised workflow is still due.
The first-line entry uses “complete” when a case is sent. The specialist entry uses it when the case is accepted. Both events can be recorded correctly. The shared queue must decide when to remove an item from the sender’s list. For a case that has been sent but is still awaiting acceptance, the two readings give different decisions. The team can now ask which event authorizes that change. If the queue already distinguishes dispatch from acceptance and applies a single unambiguous rule, the two labels alone give no reason to revise it. The reopened cases still merit inquiry.
| Card field | Filled value |
|---|---|
| Source signal | Escalations reopen after hand-off from first-line support to specialist support. |
| Problem-side EntityOfConcern | The identified source episteme SupportHandoffPolicy-E7, whose two clauses use the same completion label for different events. |
| Effective ReferenceScheme and ClaimScope | Scheme: support-interface hand-off under the new policy edition. ClaimScope: SupportOps-EU. |
| Claim family | Descriptive claim about the two policy clauses and their different completion meanings. The prediction that reopened escalations will continue while this wording remains is an untested hypothesis, not an established forecast or causal result. No actual PFR is asserted. |
| Ground for addressing the concern | For a sent case still awaiting acceptance, the two readings disagree on whether it belongs in the sender’s queue. Identify which event governs removal. To establish who remains accountable for follow-up, consult the rule assigning that responsibility. |
| Improvement check or acceptance probe | Apply the rule to a case sent but still awaiting acceptance. Does it remain on the sender’s list? To investigate actual compliance, compare the required result with what the queue recorded in that case. |
| Next use | Carry the two clause meanings and the queue question into E.18.1. Obtain the governing rule or refer the unresolved choice to the party authorized to settle it. |
| Qualification window (current here) | Use the policy edition in force at the time in question. The two-week incident window concerns the report about reopened cases. |
| Problem-formulation follow-up reason (current here) | Resolve which event the policy means by completion. Examine System, assignment, Method, Work or policy-boundary relations only if that clarification exposes a question that depends on them. |
| Validation boundary (current here) | The answer about the rule depends on its authority, wording, effective period and interface. An answer about actual operation also depends on the coverage and meaning of the incident records. |
| Readiness disposition | P2W-ready for resolving the queue rule. The receiver can interpret the rule for a sent case still awaiting acceptance. Checking whether the queue followed it in a past case requires grounds about that execution. |
| Subject-pattern cues (current here) | Use the applicable A.6 declaration or interface rule if completion semantics remains unresolved. Retain the direct grounds for a relied-on claim; use A.10 when its evidence or provenance needs a replayable account and G.11 when its currentness is at issue. Add A.2/A.2.1/A.13/A.15 for an actual classification, assignment or dated Work claim; F.6 only for precise assignment attribution, and A.21 only for a gate claim. |
A claim that the service improved would need different evidence. To compare reopening rates, identify all eligible hand-offs in comparable periods, or use a sample that supports an estimate for them. For each period, determine which hand-offs reopened within the same follow-up time and compare their proportions, accounting for changes in the case mix that affect the comparison. Check the unresolved safety, compliance and customer-impact exceptions. Looking only at reopened cases can reveal how a hand-off went wrong. It leaves the reopening rate unknown.
The P2W export is narrow: signal, joint EntityOfConcern, effective ReferenceScheme, ClaimScope, claim family, not-wish or not-preselected-Work reason, improvement check or acceptance probe, and next use. In this case it also carries the qualification window, validation boundary, follow-up reason, and subject-pattern cues because the stated next use relies on them.
Add freshness, unknown handling, source-set, representation, evidence, or other conditional content only when it is current. If the improvement check or acceptance probe is missing, the card stays reviewable-only or source-finding and cannot claim P2W-ready.
If the next user wants evidence sufficiency, a gate decision, Work authorization, or selected method, the card preserves the cue and its direct governor carries that downstream claim.
C.22.2:20.1b - Card/PFR Cardinality Replay
Every PFR reference below designates a world-side occurrence established under C.22.PFR; no card-side fact supplies its participants, adverse extent, or identity. PFR-InspectionAssignment-17 and later PFR-InspectionAssignment-18 are the two Robot-7 occurrences described in C.22.PFR:5.
For the unrelated branch, InspectionReleaseAssignment is a declared U.SystemRoleAssignment species. Occurrence InspectionAssignment-27 has admitted System Robot-8 as holder and local kind InspectorSystemRole as assigned-kind value. It obtains without interruption on [2026-07-13T10:00, 2026-07-13T10:30]; MaintenanceRoles-2026, Maintenance-Scheme-A, and the interval description interpret or describe the assertion but are not extra assignment participants.
Robot8ReleaseCriterionApplicability-4 uses predicate NoInspectorSystemRoleBeforeValidation-v2, maps the occurrence’s assigned-kind participant to the adverse nominal coordinate and its holder to Robot-8, and names Robot-8, its release ClaimScope, and [2026-07-13T09:30, 2026-07-13T12:00] as the other applicability participants. Those facts establish PFR-InspectionAssignment-27 on [2026-07-13T10:00, 2026-07-13T10:30] under C.22.PFR.
| Branch | Exact card-side objects | Result |
|---|---|---|
| One joint multi-PFR card | Robot7ReleaseEpisodesCard-E1 = <CG-Robot7-ReleaseEpisodes-E1, Robot-7, Maintenance-Scheme-A>. The ClaimGraph contains two affirmative assertion nodes designating PFR-InspectionAssignment-17 and PFR-InspectionAssignment-18. A.1 independently identifies Robot-7 : U.System, and both PFRs have that same System as their applicability-derived problem-for entity. | One ClaimGraph has one direct, joint EntityOfConcern, so one card carries both PFR references. The card records two occurrences; it does not merge them. |
| Unrelated PFRs force split | Proposed CG-Mixed-RobotReleaseProblems-E0 contains PFR-InspectionAssignment-17 about A.1-identified Robot-7 and PFR-InspectionAssignment-27 about separately A.1-identified Robot-8. No direct pattern in this replay identifies one joint EntityOfConcern for those claims; a list of the two Systems is not one. | E0 cannot constitute one ProblemCard. Split it into CG-Robot7-ReleaseProblem-E1 in Robot7ReleaseProblemCard-E1 and CG-Robot8-ReleaseProblem-E1 in Robot8ReleaseProblemCard-E1, each with its own exact System EntityOfConcern and effective scheme. |
| Several cards retain one PFR | Robot7SafetyCard-E1 = <CG-Robot7-Safety-E1, Robot-7, RobotSafety-Scheme-A> qualifies its designation by SafetyAssuranceViewpoint-E1 and receiving use AutonomousInspectionReleaseReview-E1. Robot7StaffingCard-E1 = <CG-Robot7-Staffing-E1, Robot-7, MaintenancePlanning-Scheme-B> qualifies its designation by MaintenancePlanningViewpoint-E1 and receiving use InspectionAssignmentRepairPlanning-E1. Both ClaimGraphs designate PFR-InspectionAssignment-17. | The differing ClaimGraphs, schemes, viewpoints, and receiving uses identify or qualify two cards and their claims; the PFR reference remains exactly PFR-InspectionAssignment-17. Revising, merging, splitting, publishing, or replacing either card changes no PFR participant or adverse episode. |
C.22.2:20.2 - Anti-Cases
| Anti-case | Correct result |
|---|---|
| The card is cited as safety acceptance, gate passage, tool-call action invitation, or work authorization. | Apply the pattern for the safety, gate, autonomy, work, evidence, provenance, or assurance claim; keep only the problem-side cue in the card. |
| A mathematical phrase is added because it sounds rigorous. | Remove it unless a supported consequence improves the formulation. Use domain mathematics directly when adequate, and C.29 for a live representation or transfer question. |
| A source archive’s single-score “best” is used without its declared comparison or selection basis. | Use the governing source-set and selected-set patterns; the card preserves the source-set reference, criterion, and problem-side next use, including any admissible scalar criterion or ranking and its limits. |