C.22.1:8 - Corridor, transfer, and durability discipline
- If the adaptation claim depends on entering a new solution corridor, publish the
corridorEntryBaselinefirst: the prior repertoire, baseline set, or comparison family relative to which corridor entry is being claimed. - State
corridorEntryEvidencethat supports the claimed difference from that baseline, such as a reproducible solution class, a stable descriptor shift or a supported stepping-stone sequence. Name what distinguishes the corridor; an unfamiliar sample alone does not establish entry. - If a stepping stone mattered, publish the stepping-stone evidence as part of the adaptation signature.
- Corridor or stepping-stone notes do not replace the work-measure threshold account; they explain why the adaptation path matters, not whether the threshold was reached.
- A fast threshold result is not yet enough to claim durable specialization.
- For transfer, identify the target task family, baseline and observed change there. To attribute that change to the earlier practice, give grounds that distinguish its effect from repeat testing, practice on the target or changed assistance when those explanations are plausible (C.28). State how far the evidence reaches across the target family.
- For retention, report when and under what support conditions performance was demonstrated again. Use a comparable criterion over the stated delay. An unobserved interval can remain open.
- If specialization harms neighboring task families, narrows reusable competence, or creates de-specialization cost, publish that in
downsideEffect?. - If post-threshold performance matters to later exploitation, publish
postThresholdEfficiency?to show performance after threshold crossing.