Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

C.22.1:13 - Relations

C.27 temporal-claim relation.

  • C.27 may flag: a claim that a holder, dyad, team, explicitly scoped specialist portfolio, or agent acquires usable specialization faster on one declared TaskFamilyRef or TaskSignature. A method may be selected, refined, or retired as part of that story.

  • This pattern keeps: threshold target, time-to-threshold, budget-to-threshold, prior exposure, transfer, retention, downside, corridor-entry evidence, and adaptation-signature fields.

  • “learns faster” wording without a task-family anchor leaves the adaptation claim incomplete. Faster threshold crossing alone does not establish durable specialization; retention needs its own window and evidence, and any additional transfer, downside or corridor-entry claim needs its stated grounds.

  • Next-question boundary: classify the claim as Dyn1 when only a trend is live; use C.24 for call planning after the action or option is fixed; use the C.22.1 adaptation signature when specialization is the live adaptation question.

Builds on: C.22 TaskSignature anchoring, C.19.1 BLP compatibility, A.15 system-role-kind and assignment, Method, WorkPlan, and Work-occurrence separation, C.24 call planning and CheckpointReturn semantics after the action or option is fixed, E.16 budget enforcement.

Coordinates with: G.5 selector specialization profiles, G.9 adaptation parity, G.11 later telemetry/refresh reuse.

Coordinates with: E.23 when repeated object improvement includes a claim of durable task-family specialization. C.22.1 supplies the adaptation account for that claim; E.23 governs the improvement loop.

Constrained by: E.10 lexical discipline.