C.2.8:5.2 - A technical pattern’s explicit plan

The plan in C.2.4:13.2 names Maintenance Team 2, Pump P-17, isolation, seal replacement and restoration only after LT-9 passes. For its planning use, the actor, action order and condition are explicit enough for AE4. A maintainer can recover the restore-after-pass dependency even when the note does not explain the LT-9 procedure.

If the selected use is carrying out that test, the applicable procedure must be available as a prerequisite or source return. The plan’s articulation result does not teach the missing procedure. The useful ESI comparison names which required test relations the reader can recover with the available source access; it does not replace the planning judgment with a larger or smaller AE number.