C.11.MV:4.4 - Minimal Constructed Worth Replay

Calibration-Team-A is choosing how to review reports through day D30. Until now, reviewers have used a lightweight tolerance checklist (ALT-L) for both uniform-unit and mixed-source reports. Their current procedure permits a tolerance decision on the displayed numbers without first establishing common units. An admitted alternative, M-Unit-Review-1 (ALT-M), requires the reviewer to establish common units, compare the normalized values against the declared tolerance and stop release if a mismatch remains unresolved. A manual conversion table is available. Use description edition 4 with the representation repair from A.3.1.CC. ALT-S keeps release on hold when neither review can support it. A difference in checklist wording alone would not establish a difference in the permitted review actions.

The evidence for ALT-M includes the two earlier admitted A.3.1.WT occurrences of M-Unit-Review-1 performed by the same qualified Reviewer-17: seven minutes on the ordinary same-unit report and twelve minutes plus one table lookup on the mixed-unit report; both decisions were correct and the mixed-unit release was stopped. A separate constructed matched replay of ALT-L, admitted as W-L-Rep-1 and W-L-Disc-1 under the same holder, team, report pair, and window, took five and six minutes. It accepted the ordinary report but failed to expose the mixed-unit mismatch.

The replay supplies no causal claim beyond these occurrences and no evidence about another holder or automated support route. The two earlier A.3.1.WT observations are not trials of the later representation repair in A.3.1.CC.

What is comparedALT-MALT-LALT-S
domain resultCorrect decisions in both observed reports; mixed-unit release stopped.Correct ordinary decision; mixed-unit mismatch not exposed.No additional report released; mixed-unit risk remains contained but current release Work stops.
burdenSeven and twelve minutes; one lookup; current capability and table required.Five and six minutes; lower observed burden.Delay and missing release result; no new review burden.
side effect and opportunityMore explicit trace and stop; consumes review time.Faster but leaves the named unit hazard exposed.Preserves safety while displacing release and comparison Work.
reversibilityThe team can revert the rule for choosing a review procedure while retaining earlier review records.Already in use. Continuing with it for mixed-source reports retains the exposed hazard.Reopen when the comparison or support needed for release is available.
evidence strengthTwo constructed teaching occurrences, not field evidence.Two constructed teaching occurrences, not field evidence.Consequence follows from the stated stop; downstream cost is unmeasured.

Recommend a branch through D30. Where source units may vary, use ALT-M so that the release decision depends on establishing common units. Where the input source guarantees common units, retain ALT-L. If the source units cannot be established and the formal review cannot resolve them, retain ALT-S. The two matched reports support the observed differences in review decisions and effort. Use of the repaired representation has yet to be observed.

In this constructed case the team holds the review decision, has the reviewer and table available, and adopts that recommendation for the D30 window. Record the new applicability entry APP-UnitReview-TeamA-D30 through A.3.1.MV, including the three alternatives and the source-unit condition. The team changed when reviewers use each procedure. The earlier observations still concern the procedures used on those reports.

This result covers the stated conditions through D30. For a later reliance, use A.10.1 to identify which premises remain applicable and which qualification, condition or evidence gap needs renewal. A real expiry still limits use; new field investigation is selected for its useful obtainable answer, not merely because the date advanced.

This result does not show that ALT-M is universally superior or caused every correct decision. It demonstrates why lower burden alone cannot compensate for the current release stop. The merits of that stop are a separate question when they are disputed; use §4.5 for that appraisal.

C.11.MV:4.4.1 - An Adequate Choice Before the Review Window Closes

Suppose the current report sources have an inspectable same-unit schema, the reviewer and support remain qualified for this use, and the existing comparison covers the present release question. Keep ALT-L for that bounded case and preserve the ALT-M branch whenever source-unit variability matters. Another forty-minute replay would displace review of a newly changed report before the deadline without changing this choice. The recommendation is complete on the available basis.

C.11.MV:4.4.2 - An Unresolved Alternative with No Obtainable Probe

A proposed automated conversion route might reduce later review effort, but the attainable saving is unknown and no permitted test access is available before the current decision. The existing ALT-M route still supplies the required review under its stated conditions. Retain the automation proposal for a later comparison, stop the unsupported present change, and continue the qualified ALT-M course. That decision leaves the automation comparison unresolved. Further investigation can be chosen when its obtainable answer is worth the full burden; retaining the proposal creates no trial commitment.