Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

C.11.CRC:5.1 - Flood-pump modernization

Station FPS7-C19 currently supports bounded discharge use. Compare two ways of operating it over the coming service interval. In S0 the station continues with its existing diagnostics and scheduled maintenance. In the proposed S1 it uses an additional bearing-temperature sensor. The change Δ includes placement, cabling, controller changes, access for maintenance, calibration and operating procedure. Both forecasts use the same loading scenarios. Neither forecast establishes that the sensor has been installed.

Result coordinates include discharge continuity, failure detection, maintenance access, recoverability, and evidence continuity. Resource coordinates include outage time and maintenance burden plus the resource costs of installation work, calibration, and observation.

Two gaps affect this proposal. Establish whether the proposed location can be reached during an allowed maintenance window. To assess earlier warning, compare the proposed signal with the existing diagnostics under the loads where their indications might differ. A load observation alone cannot establish access. Price each attainable check against the choice it can change (C.11.DUA). If access is impossible at this location, compare a feasible placement or retain the current configuration.