C.11.CRC:12 - Relations
- Builds on:
C.2.1,A.10,A.19,C.16,C.27,C.28, andC.29. - Supplies: a finite comparison claim to
C.11for local choice, toC.43for a connected control continuation, or directly to a field-specific portfolio, programme, intervention, architecture or experiment Method. The receiving use determines which connection is needed; these are not mandatory successive stages. - Coordinates with:
A.1.CSDwhen affected-System consequence coordinates are missing;C.18when the candidate changes the possibility space;C.19for pool governance;B.3for assurance;A.15for the distinction between transition plans (A.15.2) and performed transition Work (A.15.1); and the direct field practice for calculation and validation. - Keeps outside: universal marginal value, a new delta kind, domain formulas and thresholds, causal proof, assurance, permission, selected-set declaration, and
ChoiceResult.