| Formalism capture | A trace, constructor expression, or validationMode is treated as the source of the relation or whole identity. | Recover the participants, direct relation occurrences, construction rule, and identity or reidentification rule first. Treat the trace as a current C.2.1 account and the mode as the author’s assurance posture. | CC‑CT2R‑1, CC‑CT2R‑2, CC‑CT2R‑3; C.13 trace separation. |
| Canonical inversion | B.3.5 fields are demanded before using the relation, or one assurance branch is imposed on every relation. | Use the claim first. After election, use the applicable branch: structural parthood or collection belonging takes its required axiomatic trace; other permitted claims may use inferential or postulate support. | CC-CT2R-2, CC-CT2R-3, CC-CT2R-5. |
| Order/time leakage | Inferring parthood from sequence, parallelism or interval inclusion alone. | Recover the independent part relation under A.15.1 or A.14 when it obtains, and keep Method/order/time claims separate. | B.1.5, C.27 and B.1.4; A.15.1 or A.14 for the part/phase claim. |
| Notation lock-in | Treating one diagram or syntax as sufficient grounds for the relation, or leaving its meaning unrecoverable outside that notation. | Keep the relation’s meaning recoverable independently of one notation. Explain the interpretation and any reasoning or construction step carried by the expression under E.5.2. | E.5.2:4 and CC-NI.1–3. |
| Unexamined mapping fit | A composed claim relies on a mapping without inspecting preserved and lost distinctions. | State the mapping, its applicability and loss. Use a numeric reliability consequence only when the receiving model establishes its meaning and calculation; ordinal CL alone is insufficient. | B.3 and the mapping or representation pattern. |
| Collection/composition swap | A belongs-to predicate is used as PartOf, or a part claim is used as collection belonging, and reliability is carried over as if both were one construction. | State collection belonging and constructive parthood separately under A.14. When both obtain, keep both claims and their different set and sum accounts. | A.14 and C.13. |
| Design/run conflation | Conflating design and run claims or carrying support between them without the needed grounds. | Keep design and run claims, their evidence and conditions distinct; justify any contribution across those scopes. A design result alone does not establish successful performance. | B.3:4.8 and B.3.3:CC-B3.3.5. |