Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

B.3.4:4.4 - Choose the feasible response to the change

Determine which continuation the available support and applicable rules permit. Choose the response that addresses the change:

ResponseWhen usefulResult for the receiving use
Continue on applicable supportAvailable information is sufficient for the unchanged bounded use. A scoped reconsideration, if needed, has found no relevant loss.Retain the qualified result. No new experiment, waiver or separate no-refresh record is required merely to continue.
Narrow or restrict the useSupport remains sufficient for a smaller envelope or less demanding claim.State the usable boundary and the limitation that changes the recipient’s action.
Refresh or inspectAn obtainable check can resolve a material uncertainty or fulfil a binding review requirement.Choose that check with regard to what its result can change, its cost, delay and displaced work; assess its result if the check is performed.
Suspend reliance or deprecate the affected resultThe necessary support is absent or defeated and no permitted continuation carries the requested use.Remove or qualify that reliance and communicate the affected reach. A status downgrade does not accept the underlying harm.
Apply an authorized exceptionAn applicable rule permits a bounded exception and a competent authority can grant it for this case.Follow the mandate, scope, conditions and accountability. A senior title alone grants no authority over affected risk bearers.

C.11 and C.19.2 support the choice of worthwhile additional evidence. An existing result may already establish the required condition for this use. A design commission can finish with the justified trigger, observation and response. A separately required inspection calls for the agreed work or evidence that the required inspection has taken place. If it cannot be performed in time, identify the unfulfilled requirement and any warranted action still available.

For an immediate unchanged use, stop with its usable result. When a later receiver needs a warning, limitation or retained reason to avoid unsupported reliance, keep that minimum content with the existing result or publication. A separate DeprecationNotice is useful when something is deprecated, not as proof that refresh was skipped.