B.3.3:8 - Relations
- B.3, A.10 and C.2.1: define the assurance result, evidence-use references and target claim.
- B.5.3 and B.3.5/C.13: supply needed concept correspondence and the elected, relation-specific construction account.
- C.2.1 and E.14: keep the identified Working-Model claim distinct from its assurance publication. A.4 supplies a System design/operation comparison only when that is the claim being assured.
- B.3.4 and C.27.TA: qualify currentness by the relied-on use, conditions and temporal reference.
- C.11 and C.19.2: support the choice of worthwhile additional evidence when that decision is live.
- B.4 and Part D: may consume a qualified assurance result in their transition or decision rules; this pattern supplies neither an automatic evolution gate nor risk-acceptance authority.