B.3.3:3.4 - Worked case: a useful empirical result and an irrelevant fresh test
A team is deciding whether a converter can be used for non-safety-critical measurements within a declared temperature and input range. In this example, the receiving task’s justified tolerance is 2%. Calibration results covering that range, an adequate measurement-error account and applicable operating observations support error below that tolerance. The team can return “supported for this measurement use within the stated range,” with its limitations. A formal proof of unrelated program properties is unnecessary.
Now replace that basis with a newly passed boot test and a glossary mapping. These establish startup behaviour and the intended term correspondences, not measurement accuracy. The same requested measurement use remains unsupported. Neither fresh evidence nor one link of each required type repairs the missing performance basis.
If the recipient instead needs a mathematical invariant, inspect the proof under its assumptions. If the application introduces a protective function or a different operating range, reopen the affected assurance question under its threshold and evidence rules. The earlier limited result remains an account of what it supported.
To design a profile for later converter assignments, recover what each recipient uses the measurement to decide. An offset that stays the same in two readings cancels in their difference. The same offset can decide whether an absolute limit has been crossed. Develop criteria for the quantity being accepted and the operating conditions that could change its error. Applying the existing 2% criterion remains sufficient for the original assignment when its grounds still hold.