| Named aggregate as system | “The platform” or “the fleet” is treated as a system because it has a name. | Identify one candidate and apply the A.1 and U.System criteria; if either fails or cannot be determined, withhold system-result recognition and return that failure or unknown to B.2 without inferring that the old whole is sufficient. |
| Component certificate transfer | Individual part certificates are used as result-system assurance. | Re-base assurance through B.2.2:4.5 and evidence-use patterns. |
| Controller as containing whole | A controller or external system is treated as the new whole because it changes the parts. | Use A.12 and A.3.4 for the acting-side and transformation claims. Use B.2.5 for a supervisor-subholon feedback question and a part-whole pattern for the claimed parthood. |
| Dashboard as represented system | A monitoring model is identified with the system it monitors. | Use episteme, publication, source-use, C.30.AD, or digital-twin description patterns for the monitoring account; recover the monitored system independently. |
| Capability jump as system MHT | A metric improves and the result is called a new system. | Perform B.2’s ordinary existing-whole comparison; return to capability, characteristic, Method, Work, or architecture patterns if the existing whole remains sufficient. |