Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

B.1.6:6 - Archetypal Grounding

Ordinary operator-time total. Two existing records, with their value-attribution grounds, attribute one hour each to two admitted Work occurrences by the same operator. Their participant and time facts establish that these are distinct, disjoint resource contributions within the chosen accounting period. Addition yields two operator-hours; an existing table can state that result and its basis. This answer need not assert a separate dated occurrence of aggregation Work. If both entries instead copy the same one-hour contribution, adding them would double-count it: recover the common contribution and count it once, or leave the affected total unresolved until that identity is established.

If the two one-hour entries may be copies or distinct contributions, and the records exhaust the stated scope, total operator time lies between one and two hours. This settles a two-hour upper limit, even while exact utilization remains open. A roster showing two planned hours would answer a scheduling question. Establishing how much time the operator actually spent uses the resource records for the period.

Engine test programme. C.16 measurement Work attributes fuel mass, electrical energy, operator time, and emissions values to subjects under their Scales, models, calibration bases, windows, and uncertainties. Each has its result episteme. Test-run occurrences and obtaining A.15.1 Work-part relations define the included Work set; independently declared C.27.TA overlap facts state shared timing. A test-cell or engine phase enters only through the carrier’s identity rule and proper phase relation. Shared warm-up energy is recorded under the temporal and resource-use facts.

Dated aggregation Work applies ProgrammeResourcePolicy-v3, which allocates warm-up energy once and propagates input uncertainty. The B.1.6 result is a typed resource vector plus qualifications; a C.2.1 episteme states it. A later emissions verdict remains separate evaluation Work and result.

Manufacturing cell. Welding and painting are two dated Work occurrences. Electricity, gas, consumables and labor time are separate resource Characteristics with measurement-result epistemes. Recover what each component includes: the same fan-energy contribution or operator-time contribution must not be counted twice. For a combined cell total, count a shared contribution once; if the question allocates it to individual jobs, apply a justified allocation rule. Distinct, disjoint uses of the same fan or operator remain separately countable. The resource ledger represents those facts. Establish any separately claimed Work-part relation or frame transformation through its pattern.

Model training. Epoch labels alone do not establish work parts. Ground the training work and slices, then recover C.16 measurements for compute energy, storage traffic, and operator time. Aggregation work applies an edition-pinned policy to those result epistemes. The training Method, any algorithm text that qualifies as its MethodDescription, and the dated training Work remain distinct; trained-model identity, fairness result, provenance, assurance, and deployment decision stay with their subject patterns.