Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

B.1.6:5.1 - Aggregation obligations

ObligationWhat must be named
Resource inputCharacteristic, Scale, applicable Unit, subject, time basis, attribution grounds and uncertainty relevant to the use. A claimed performed measurement retains its C.16 Work/result; an estimate or derived value retains its sources, model and conditions.
Included subjectsGrounded coverage of the accounting subjects, and the identity of every individual occurrence whose attribution the conclusion uses or supplies; every Work-part, temporal-overlap, resource-use or stock relation used by this aggregation; and the identity and PhaseOf grounds for any included non-Work carrier phase.
PolicyInclusion and output kind; every conversion, weighting, missing-value, allocation, uncertainty or overlap rule needed for the result or use; and an edition when either depends on it.
Dated aggregation Work, when asserted or requiredPerformer identified through A.13; dated U.Work independently admitted through A.15.1; a separate F.6 check when assignment-bound attribution is needed; separate Method, resources and direct/A.6.1 bindings.
Aggregation resultFor an application, the typed result, included subjects, rule, boundary, time basis and qualifications. For a design, the input selection and rule that will supply the required output under the stated conditions. When the receiving claim or use needs a result episteme, identify it through C.2.1 as in §2.
Source basis and currentnessRecoverable sources and derivations; A.10 when source-to-use reliance must be replayable, G.6 when that chain needs a stable address, and G.11 when currentness affects use.
Later useThe receiving claim, action or judgement and any premise, reference, argument or decision-use relation it requires.