Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 23:10:10 UTC

B.1.5:4.5 - Keep Method Qualification And Work Occurrence Separate

B.1.5 evaluates and grounds the composite-method qualification of a U.Method already identified under A.3.1. A separately constituted U.MethodDescription may state that composition claim. Neither object creates performed Work.

One dated U.Work occurrence enacts one U.Method only when the A.15.1 method-enactment relation obtains. Recover each performer through A.13; A.15.1 then independently identifies the Work, time, containing System, and enacted Method.

F.6 enters only when the Method-enactment account also consumes assignment-bound attribution through the same obtaining A.13 assignment; missing or failed F.6 alone leaves independently grounded Work and enactment intact. If the same finding invalidates a premise consumed by A.13 or A.15.1 admission, recheck that premise and its dependent conclusions while preserving independently grounded history and relations.

The performing System acts under the recovered relations. An assertion or occurrence description may cite those facts and the MethodDescription used.

Parameter bindings, affected referents, resource use, telemetry, retries, results, transformations, production, evidence, evaluation, delivery, and acceptance remain separate objects and relations under their governors. They do not become method parts, method identity fields, or generic Work outcomes merely because a report places them beside the Work.

The composition link is not one-to-one. A Work occurrence may enact the whole method without exposing every submethod as a separate work part. An A.15.1 TemporalPartOf_work may enact the same whole method during its selected interval. An A.15.1 episode may span several method factors, repeat one factor, or be split by evidence policy without changing the method identity.

Conversely, a work part does not establish a submethod. A work part enacts a submethod only when that submethod is already an independently identified U.Method and a separate enactsMethod(workPart, submethod) occurrence obtains.

Reader check. Before saying that a work part enacts a submethod, name both sides:

  • the occurrence-side object: parent U.Work, obtaining work-part relation, interval or boundary, and performer System recovered through A.13; only when this reader check consumes assignment-bound attribution, also name the covering A.2.1 assignment and obtaining F.6 relation; add any separately obtaining resource or evidence relation only when used;
  • the method-side object: A.3.1 submethod, methodPartOf occurrence, whole-forming claim at its A.6.RCD disposition, preconditions, intended result or preserved condition, interface boundary, and whole-Method identity;
  • the cross-side fact: the enactsMethod(workPart, submethod) occurrence.

If one of these grounds is missing, leave that claim unresolved while retaining the independently supported claims. A Work part and a submethod each need their grounds. Keep a method-description node, evidence segment, mechanism material, system-component behavior, or A.15.4 appearance-based reliance repair request under its subject pattern.

For a working question—what larger work is being done through this action now—use B.1.5.EW. It recovers the constitutive connections at the needed grain and shows how a changed encompassing condition changes the action. An ongoing whole need not be completed, and its constituents need not all act at once. When changing a constituent for use in one or several wholes, B.1.5.RS follows the change through their entry conditions, interactions and required results. The qualifications above still decide the corresponding Method and Work claims.

B.1.5:4.5.1 - Planning And Performed-Work Obligations

B.1.5 has three common use positions, but they are positions in use, not U-kinds:

  • Planning or description-side use. To plan enactment, recover the Methods, methodPartOf facts, other whole-forming claims at their A.6.RCD dispositions, needed order and joins, interface boundary, invariants, and whole-level commitments. A resulting U.WorkPlan uses A.15.2 and may cite the MethodDescription edition on which it relies. Identify dated planning Work under A.13 and A.15.1 only when that occurrence is asserted; planning and its product remain separate from Method identity.

  • Performed-work use. Recover each performer through A.13, let A.15.1 independently admit the Work, and recover the enactsMethod occurrence for the whole Work. Add the covering A.2.1 assignment and F.6 relation only when this use consumes assignment-bound attribution; missing or failed F.6 alone leaves independently grounded Work and enactment intact. If the same finding invalidates a premise consumed by A.13 or A.15.1 admission, recheck that premise and its dependent conclusions while preserving independently grounded history and relations.

    Check capability fit or admission only when the work-entry decision consumes those claims; then check preconditions, order conformance, and exposed or forwarded interactions through their subject patterns. State resource use, evidence, and results only through their obtaining relations. None becomes part of the method.

  • Assurance use. Identify cutset submethods, fragile typed joins, adapter points, mapping congruence or CL-sensitive edges, and the envelope or scope in which the composite method is expected to hold. B.3 and related assurance patterns evaluate those hooks; B.1.5 only makes them visible.

Useful invariants remain:

  • A single recovered submethod composed alone does not create a surprising new Method.
  • Order is deterministic only under the order claims and conditions at their selected A.6.RCD dispositions.
  • A throughput or quality bound identifies its characteristic, the conditions it covers and the rule that warrants the bound. A critical path, a bottleneck, parallel capacity or a bound on the combined result may supply those grounds.
  • A claim that improving a submethod, adapter, or typed join improves the composite must name the characteristic and conditions under which that improvement transfers.
B.1.5:4.5.2 - Stop Before Transformation Composition

Method composition and Work decomposition establish no U.Transformation part, composite transformation, transformation atomism, or TransformationPartOfRelation. Even when several method parts address the same referent and one Work enacts the whole method, identify each transformation independently under A.3.4. If a claim needs transformation composition and no transformation-composition governor supplies its participants, obtaining rule, and occurrence identity, return missing-governor[transformation-composition] for the proposed whole and independently identified changes. Do not infer either composition or indivisibility from the gap.