B.1.5.CM:5 - Archetypal Grounding — C-EC-Release-v2
The EC-417 project proposes C-EC-Release-v2 as a whole for safety-relevant release coordination.
Under A, the team waits for signed supplier evidence before integrating the software. Under B2, it integrates from a versioned provisional edition, reconciles it with signed evidence before safety closure, and assigns most preparation of the changes between the editions to the supplier-configuration role to keep the safety engineer within the peak limit. C.32.MWA.PP §5.3 gives the timing and capacity comparison. A can be selected only before integration; recovery R is used when closure fails after early B2 integration.
The proposed account states:
| Whole position | Proposed content |
|---|---|
| intended result | a release-authorizable evidence and integration state for one safety-relevant change |
| situation family | internal or supplier-originated hardware/software changes with versioned provisional or signed pinout evidence |
| invariant | provisional evidence may support reversible early integration, but signed evidence and repeated checks are required before safety closure and release authorization |
| participants | identified M-HW-Verify, M-SW-Integrate, M-Supplier-Approve, and M-Release-Authorize; candidate reconciliation accounts remain separate |
| permitted variation | pre-entry A when signed evidence or B2 entry conditions differ; B2 for bounded early integration; post-entry recovery R after a failed B2 closure |
| bounds and stops | confidentiality, human authority, D-8 safety peak at or below 0.40, signed evidence before closure, and reversibility until D-1 |
| reidentification | preserve the intended result, invariant, participant-status boundary, evidence-version guard, authority, and A/B2/R branch meanings |
The four participant Methods are identified, but the proposed whole is not. Their co-use and the proposed order do not establish that they are Method parts. The relation sets therefore remain proposed:
- provisional-evidence integration at
D-21and signed-evidence reconciliation atD-8; - signed evidence and accepted safety result before release authorization;
- supplier preparation responsibility for
1.60 hunder B2; - separate safety and release authority;
- PLM, rig, and provider-access conditions; and
- description correspondences from evidence version through integration bundle and verification result.
For this selected trial, B.1.5.CM returns a prospective candidate account with a WorkPlan covering at most three B2 releases. The whole and relation claims remain proposed.
At each proposed release’s D-21 entry checkpoint, SafetyReviewer-17 accepts or rejects the entry evidence under ASG-SafetyReview-17 and AUTH-SafetyEvidence-17; ReleaseDecider-17 then decides branch entry under ASG-ReleaseDecision-17 and AUTH-ReleaseDecision-17. The filled entry case identifies these decisions as W-SafetyEvidenceDecision-17 and W-ReleaseDecision-17.
For closure or recovery, the two decision-makers use the evidence then available to decide safety-evidence acceptance and release, withhold, or next-slot disposition under the applicable assignments and authorities. Each performed later or repeated decision is a distinct dated Work occurrence with its inputs and result. Neither decision or authority relation substitutes for the other.
In B2, TraceReviewer-17 accepts or rejects each AI trace suggestion used by the release branch under ASG-TraceReview-17 and PERM-TraceAcceptReject-17. The full EC-417 application, §16.9.5 records the one permission grant and the dated Work W-TraceAcceptReject-17-01 that returns acceptance in the filled case. The separate relation PEX-TraceAcceptReject-17-01 connects that dated Work to the permission it exercised. EV-PEX-TraceAcceptReject-17-01 supplies evidence about this exercise.
Each additional used suggestion requires its own dated decision Work and result, confirmation that the permission applies at that time, and its own Work-to-permission exercise relation.
If signed evidence is missing at the D-8 closure checkpoint, withhold release and enter recovery R. In R, preserve the performed-integration record and evidence history. Repeat the evidence comparison and affected verification when evidence arrives by D0 while the existing evidence and reversibility guards still hold. Record whether early integration is retained, rolled back, or repeated, and the added burden. If closure remains unresolved at D0, the release result is withhold/next-slot and this R occurrence ends as a failed B2 trial.
ASG-TraceReview-17 and PERM-TraceAcceptReject-17 end at D0; continuing safety or release relations extend neither. This trial provides no post-D0 AI-supported continuation and asserts no later Work or recovery WorkPlan. Unresolved R may motivate separate later planning.
When later non-AI recovery needs coordination, the project may create a new A.15.2 WorkPlan; A.15.2 does not require planning before every otherwise valid later Work. Planned or unplanned Work would still need its separate qualification/currentness, readiness, assignment, permission/authority, and A.15.1 occurrence as applicable. These stops preserve all earlier Work and evidence history. A is only a pre-entry alternative.
Acceptance observations include whether each trial respects confidentiality and authority, remains at or below the D-8 capacity bound, preserves evidence/version correspondence, and reaches a release or recovery result by D0. An attempted post-D0 AI-supported continuation, or an assertion of later Work without a separately admitted A.15.1 dated Work occurrence, is a stop and failed trial observation.
The withhold/next-slot result preserves earlier Work and may motivate later planning. Those observations may support, narrow, split, or reject the account. They do not by themselves identify the whole; A.3.1 remains the identity owner.
For this series, a release counts once as a failed trial if it has a capacity or supplier-pinout/integration-bundle mismatch failure or enters R, even if recovery later succeeds; keep all failure reasons.
After two distinct failed trials, ReleaseDecider-17, within AUTH-ReleaseDecision-17, returns B2 for revision or rejects further use. That disposition retains the separate safety decision and grants no authority to revise the account. The immediate confidentiality, assignment, permission and authority stops still apply to the first breach. The existing decision covers at most three trials; a further release needs a new applicable decision.
B.1.5.CM:5.1 - Finish a Design Comparison Before a Trial Is Available
Suppose an earlier design use asks whether this release-coordination proposal preserves signed-before-closure, confidentiality and the A/B2/R distinctions well enough to compare with another proposal. The sources support that account, but whole identity and composition relations remain unresolved, and the team has no rig access, allocated effort or trial window. Return the traceable prospective account with those identity and relation limits. The receiving designer can compare the proposals and finish that question on the available content.
If the assignment is instead to devise a release procedure, start from what the release decider must establish at closure. Early integration from provisional information leaves a possible difference from the signed edition. Work back to the need to detect that difference, determine which checks it affects and supply their results before authorization. Waiting for signed evidence can remove the provisional-to-signed comparison while changing the time available for integration. Choose an arrangement that satisfies the applicable time, access and authority conditions. State which evidence can be supplied from outside the Method and which verification the proposed rule requires within it.
A later opportunity with useful obtainable observations can warrant implementation or a trial and its coordination plan. The already selected three-release case above retains its WorkPlan, observations and stops.