Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

B.1.1:5 - Archetypal Grounding (Worked Cases)

B.1.1:5.1 - Plant Supplier

Source graph: PowerGrid -> Plant.

If the edge means electricity supply, recover that supply relation. It establishes neither plant parthood nor its absence. Test a separate part-whole claim under the chosen whole’s identity and parthood rules; an independently admitted internal power subsystem can be both a supplier and a part.

B.1.1:5.2 - Digital Twin

Source graph: DigitalTwin -> Turbine.

If the edge means representation, recover the architecture-description, publication, source-use, evidence, or digital-twin relation. The digital twin is not a turbine component by graph adjacency.

B.1.1:5.3 - Work Plan And Work Occurrence

Source graph: Prep -> Weld -> Paint.

If the graph describes a method or process view, use the patterns that define the method, description, and order claims. If it describes performed Work, use A.15.1 with occurrence identity, timing, evidence, and the Work relation. If one graph represents both, distinguish the Method or plan relations from the evidenced Work relations.